Products | Rock Splitters | C20 C
Darda
Rock Splitters
make the
difference
Small carriers
Best power-to-weight ratio
Low vibration and dust almost noiseless
Economical and safe
Accurate splitting
Can be used under water
C20 C – machine-
guided splitting
The Rock Splitter is the solution especially in urban and sensitive areas, because there is almost no noise and vibration, as well as flying rock, in comparison to conventional methods and the related safety measures, costs and delays.
It is especially suitable for narrow applications such as trenching or foundation work, as well as rock quarrying and block extraction of natural stone in open-cast mines, since other work can continue in parallel at any time.
The rock is not pulverized by the splitting technique. The cohesion of the material remains given and the production of larger split pieces guarantee with more volume per borehole highest productivity under safe conditions.
The pendular Rock Splitter can be attached to almost any hydraulic boom with a chain, making it very adaptable and it constantly aligns itself with gravity.




















