Concrete
Crusher
CC260
Concrete
Crusher
CC260
For mechanical positioning.
Full crushing force always guaranteed independent of the inlet pressure of the carrier.
Durable robust rebar cutting blades for strong reinforcements.
Property right: registered design. Increased productivity by shortening machine downtime and reducing maintenance costs for time-consuming buildup welding.
Products | Concrete Cruhsers | CC260
Darda
Concrete
Crushers
make the
difference
22 t crushing force
Small carriers in confined spaces
250 mm large opening width
Low noise demolition
43 t cutting force
Exchangeable crushing tips
Small and
compact
With great
crushing force
The compact and powerful Concrete Crusher from Darda show their strength especially in indoor demolition in very confined spaces, during operation or in busy environments, but also as an all-round Concrete Crusher in many other applications. Work effectively and safely with significantly lower emissions compared to other demolition methods in terms of noise level, shocks and vibrations!




















