Hydraulic
Power Unit
EP3 110 V

1
2
3
4
5
6
7
8
9
10

Hydraulic
Power Unit
EP3 110 V

1
Two-stage pump for max. productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
Connection option 110 V / 60 Hz

The integrated device connector (NEMA 5-15R) is suitable for NEMA 5-15P (110 V) type power plugs for the North American market.

3
High quality motor

With extra large control box in which all capacitors are stowed.

4
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

5
Closed hydraulic system

All parts run in oil.

6
Manifold for up to 3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

7
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

8
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

9
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

10
Clad steel frame

New designed Metal housing for best protection under rough working conditions

Hydraulic
Power Unit
EP3 110 V

1
2
3
4
5
6
7
8
9
10

Hydraulic
Power Unit
EP3 110 V

1
Two-stage pump for max.
productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
Connection option 110 V

The integrated device connector (NEMA 5-15R) is suitable for NEMA 5-15P (110 V) type power plugs for the North American market.

3
High quality motor

With extra large control box in which all capacitors are stowed.

4
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

5
Closed hydraulic system

All parts run in oil.

6
Manifold for up to
3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

7
Robust steel frame with wheels
and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

8
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

9
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

10
Clad steel frame

New designed Metal housing for best protection under rough working conditions

Products  |  Hydraulic Power Units  |  EP3 110 V

Darda Hydraulic
Power Units make
the difference

Safety

Parallel overpressure protection systems with knock-off valve.

Mobility

Easy for one person to transport and fits in any car trunk.

Productivity

Reliable and fast due to 2-stage pump.

User-friendly

Robust and easy to use.

High performance

High pressure 50 MPa.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
EP3

Weight
54 kg
Power system
Electric
Flow rate low-pressure stage
5 l/min
Flow rate high-pressure stage
1,6 l/min
Filling capacity oil tank
5 l
Data sheet EP3 110 V | PDF
Catalog | PDF | 17 MB

Mounted lifting eyes
for 4-leg sling chain

Accessories

Quick couplings

Safety box (GFCI ground fault circuit interrupter)

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Emission free
for indoor and
outdoor areas

Electric drive

EP3 110 V / 60 Hz – emission-free
high pressure up to 500 bar

EP3 110 V / 60 Hz
emission-free high pressure
up to 500 bar

The EP3 110 V / 60 Hz electro-hydraulic power unit is the latest addition to our new design generation and has been engineered specifically for the North American market. Inspired by the proven performance of our EP3 230 / 400 V series, this new model delivers the same trusted reliability and power with a maximum oil-pressure of 7250psi – now tailored to meet North American electrical standards. After years of demand, the wait is finally over: a dedicated electric hydraulic power unit designed for North America.

Built with efficiency in mind, the EP3 operates with remarkably low power consumption, allowing users to run high-performance hydraulic demolition tools without requiring heavy electrical infrastructure. The unit connects through a rugged, North American standard plug, providing quick, safe, and hassle-free setup wherever the job takes you.

Compact, modern, and built for real jobsite performance, the EP3 110 V / 60 Hz delivers consistent hydraulic output while maintaining an exceptionally quiet operating level. Its low-noise performance makes it ideal for indoor work, urban projects, and other noise-sensitive environments where traditional power solutions are simply not an option.

Designed to withstand demanding working conditions, the EP3 features a durable construction that ensures long-lasting performance and reliability. Its compact footprint and jobsite mobility make it easy to transport and deploy, giving contractors and industrial operators a powerful, dependable, and highly efficient hydraulic power solution they can rely on every day.