Combi-Shears
HCS8
The handheld, hydraulic Combi-Shears HCS8 are equipped with well-proven cutter and gripper technology and are particularly suitable for the gutting and controlled deconstruction of buildings. They are also versatile in other applications. One person can easily handle the compact and lightweight devices.
The very powerful Combi-Shear work safely, quickly and productively. The integrated control valve allows sensitive control of closing and opening and can also be locked. The working process can be controlled at any time. Dust, vibration and noise levels depend on the material, tool configuration and operating conditions and must be assessed for the application. Suitability for indoor use and effects on ongoing operations must be assessed for the specific site.
The Solution for
Many Tasks
Concrete Jaw
HCS8 J
Demolition of up to 15 cm
thick concrete walls.
Brick Jaw
HCS8 B
Demolition of up to 32 cm
thick masonry.
Sickle Blade
HCS8 S
Cutting through, round materials
up to 16 mm diameter.
Shear and Spreader
HCS8 C
Radiators can be pressed from the wall, door frames can be broken out.
A Complete
System for
Different
Applications
1 – Concrete Jaw HCS8 J
2 – Brick Jaw HCS8 B
3 – Sickle Blade HCS8 S
4 – Shear and Spreader HCS8 C
Darda
Combi-Shears
Make the
Difference
Powerful and multifunctional
Controlled hydraulic operation
Compact and lightweight
Economical and controlled




















