Hydraulic
Power Unit
D4

1
2
3
4
5
6

Hydraulic
Power Unit
D4

1
Holder for the splitters for transport

Left and right site for 1 splitting cylinder each.

2
Tilt-resistant robust steel frame

A flip-up foot allows the unit to be jacked up for even better stability.

3
High quality engine

Robust Hatz engine with worldwide support / EU 2016/1628 stage 5 emission limit certified.

4
Optional with manifold for up to 5 device connections

Robust Hatz engine with worldwide support / EU 2016/1628 stage 5 emission limit certified.

5
Optional with electric starter

Even at low temperatures, a powerful battery starts the unit reliably.

6
Robust wheels for easy transport

Wheels with pneumatic tires simplify relocation on the construction site.

Hydraulic
Power Unit
D4

1
2
3
4
5
6

Hydraulic
Power Unit
D4

1
Holder for the splitters
for transport

Left and right site for 1 splitting cylinder each.

2
Tilt-resistant robust steel frame

A flip-up foot allows the unit to be jacked up for even better stability.

3
High quality engine

Robust Hatz engine with worldwide support / EU 2016/1628 stage 5 emission limit certified.

4
Optional with manifold for up to 5 device connections

Robust Hatz engine with worldwide support / EU 2016/1628 stage 5 emission limit certified.

5
Optional with electric starter

Even at low temperatures, a powerful battery starts the unit reliably.

6
Robust wheels for easy transport

Wheels with pneumatic tires simplify relocation on the construction site.

Darda Hydraulic
Power Units make
the difference

Safety

Parallel overpressure protection systems with knock-off valve.

Mobility

Pneumatic tires allow easy relocation.

Productivity

Reliable and fast.

User-friendly

Robust and easy to use.

High performance

High pressure 50 MPa.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
D4

Weight
137 kg
Weight with electric starter
156 kg
Power system
Diesel
Flow rate high-pressure stage
5,4 l/min
Filling capacity oil tank
10 l
Data sheet D4 | PDF
Catalog | PDF | 17 MB

Accessories

Quick couplings

Mounted lifting eyes

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Independent
and reliable
for continuous
use

Diesel drive

D4 – reliable
high pressure

With the D4 mobile diesel high-pressure hydraulic power unit, you are always quickly ready for operation and independent of other operating sources.

This model is designed for areas where electric or gasoline powered units are not allowed and where you need a power unit that can run continuously for many hours without interruption. Equipped with manual start as standard, but also available with electric start. An optional manifold allows up to 5 Rock and Concrete Splitters to be connected and run in parallel. It reliably supplies the Darda handheld demolition equipment with a system pressure of 500 bar. The side supports on the robust and tilt-resistant steel frame allow easy transport of the equipment, also thanks to the large pneumatic tires. The diesel-powered high-pressure hydraulic unit is certified according to EU 2016/1628 Stage 5 and is the ideal companion for daily use, especially in natural stone quarrying.