Hydraulic
Power Unit
AP3

Hydraulikaggregat Darda AP3
1
2
3
4
5
6
7
8
9

Hydraulic
Power Unit
AP3

1
Two-stage pump for max. productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
Maintenance unit

Clean and dry air supply to the engine ensured by water separator and oil mist separator.

3
High quality engine

Durable engine with extra large silencer.

4
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

5
Closed hydraulic system

All parts run in oil.

6
Manifold for up to 3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

7
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

8
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

9
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

Darda Hydraulic
Power Units make
the difference

Restart protection

No automatic motor restart after loss of compressed air

Mobility

Easy for one person to transport and fits in any car trunk.

Productivity

Reliable and fast due to 2-stage pump.

User-friendly

Robust and easy to use.

High performance

High pressure 50 MPa.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
AP3

Weight
47 kg
Power system
Compressed air
Flow rate low-pressure stage
5 l/min
Flow rate high-pressure stage
1,6 l/min
Filling capacity oil tank
5 l
Data sheet AP3 | PDF | 206 KB
Catalog | PDF | 17 MB

MOUNTED LIFTING EYES
FOR 4-LEG SLING CHAIN

Accessories

Quick couplings

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Hydraulikaggregat Darda AP3 Hydraulikaggregat Darda AP3

Safety for
sensitive areas

Air drive

AP3 – Safe
High-Pressure Operation

The portable, driven by compressed-air high-pressure hydraulic unit AP3 enables safe operation even in sensitive work environments – anywhere electric or gasoline engines are not permitted. Thanks to its compact design, it fits easily into any car or van.

Lightweight and easy to handle, the unit reliably supplies Darda’s handheld demolition equipment with a system pressure of 50 MPa. The robust air motor is equipped with a silencer and features an integrated maintenance unit, ensuring maximum operational reliability and a long service life.

The pre-mounted manifold allows optional up to three devices to be connected and operated simultaneously. For easy transport within a building, the unit is equipped with integrated wheels and an extendable handle. Suitable lifting eyes also enable straightforward crane transport using a “4-leg sling chain.”

The enclosed steel frame provides optimal protection in tough working conditions while maintaining the unit’s compact form. All tools required for operating the hydraulic attachments can be securely stored in the integrated tool box – always within reach and well protected.