Products | Combi-Shears | HCS8 J
Darda
Combi-Shears
make the
difference
Multifunctional
Nearly noiseless, low-vibration and low-dust
Compact and lightweight
Economical
15 cm thick concrete walls
8.8 t crushing force
A complete
Combi-Shear
consists of three
components:
1. Hydraulic Combi-Shear
2. Hydraulic Power Unit
3. Hydraulic hose set (high and low pressure)
Combi-Shear
HCS8 J
Depending on the compressive strength of the concrete, the HCS8 J Concrete Jaw can be used to demolish concrete walls up to 15 cm thickness. Ideal for demolition of thin partition walls, exterior slabs or for renovation of prefabricated buildings.
The very powerful Combi-Shear works quickly and productively. One person can easily handle the compact and lightweight device. The integrated control valve allows sensitive control of closing and opening. The working process can be controlled at any time. It causes no dust, no vibrations and is extremely quiet. This means that it can also be used indoors without hesitation and does not interfere with ongoing operations.




















