Hydraulic
Power Unit
BP3

Darda BP3 Hydraulikaggregat
1
2
3
4
5
6
7
8

Hydraulic
Power Unit
BP3

1
Two-stage pump for max. productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
High quality engine

Durable, fuel-efficient Honda engine ensures safe operation.

3
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

4
Closed hydraulic system

All parts run in oil.

5
Manifold for up to 3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

6
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

7
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

8
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

Darda Hydraulic
Power Units make
the difference

The product trailer and a product test on Mount Titlis (3,020 m, Switzerland) impressively demonstrate the performance of the Darda BP3 hydraulic power unit.

Safety

Parallel overpressure protection systems with knock-off valve.

Mobility

Easy for one person to transport and fits in any car trunk.

Productivity

Reliable and fast due to 2-stage pump.

User-friendly

Robust and easy to use.

High performance

High pressure 50 bar.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
BP3

Weight
50 kg
Power system
Gasoline
Flow rate low-pressure stage
5 l/min
Flow rate high-pressure stage
1,6 l/min
Filling capacity oil tank
5 l
Data sheet BP3 | PDF
Catalog | PDF | 17 MB

Mounted lifting eyes
for 4-leg sling chain

Accessories

Quick couplings

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Suitable for
use up to
3000 m above
sea level

BP3 – Independent High Pressure.
Maximum Mobility.

With the portable BP3 gasoline high-pressure hydraulic power unit, you are always ready for operation – independent, compact, and powerful. The unit fits easily into a vehicle and, thanks to its low weight and ergonomic design, is ideal for flexible use on construction sites.

The Honda Professional GX200 engine delivers reliable power as a higher-performance model while maintaining low fuel consumption.

The pre-mounted manifold allows optional up to three devices to be connected and operated simultaneously. For easy transport, the unit is equipped with integrated wheels and an extendable handle. Suitable lifting eyes also enable straightforward crane transport using a “4-leg sling chain.”

The enclosed steel frame provides optimal protection in tough working conditions while maintaining the unit’s compact form. All tools required for operating the hydraulic attachments can be securely stored in the integrated tool box – always within reach and well protected.

The gasoline-powered high-pressure hydraulic unit is EPA and CARB certified, tested for altitudes up to 3000 m, and impresses demolition professionals and rental companies alike with its reliability, robustness, and durability.