Steel Shear
CC700 S
Steel Shear
CC700 S
Simple, precise and efficient positioning for best results.
For mechanical positioning.
Full cutting force independent of the input pressure of the carrier.
Increase productivity by shortening machine downtime and reducing maintenance costs.
With the conversion kit to Concrete Jaw, CC700 can be used to its full potential.
Products | Steel Shears | CC700 S
Darda
Steel Shears
make the
difference
Controlled demolition
188 t cutting force
Small carriers
268 mm large opening width
Powerful in confined spaces
Internal coring made easy
Maximum power
for the best cut
The compact and powerful steel shear from Darda shows its strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility pipes, as well as in the recycling of metal beams in scrapping yards.
The Darda CC700 S can also be used as Concrete Crusher with an optional concrete jaw set, as well as three possible types of crushing tips.




















