Multi Cutter
MC300

1
2
3

Multi Cutter
MC300

1
360° hydraulic rotary drive

Easy positioning of the cutting blades with high precision.

2
Slim design

Rugged and compact, for easy handling even in hard-to-reach places.

3
Exchangeable cutting blades

Easy maintenance, thanks to exchangeable cutting blades.

Products  |  Multi Cutters  |  MC300

Darda
Multi Cutters
make the
difference

Controlled cutting

Utility lines, pipes, cables, steel beams and more.

Safe use

Low noise, dust and vibration.

High productivity

Easy exchanging of the cutting blades.

Small carriers

Limited access/load – no problem.

Powerful in confined spaces

Small and compact with 60 t cutting force.

Stability guaranteed

Safe pulling down and lifting of installations.

Specifications
MC300

Weight
310 kg
Jaw opening
350 mm
Recommended carrier weight
2.5 - 9 t
Cutting force, max.
590 kN (60 t)
Data sheet MC300 | PDF | 207 KB
Catalog | PDF | 17 MB

Highest
cutting force
with low
weight

For
carriers
from 2.5 - 9 t

Highest
cutting force
with low
weight

The compact and powerful Multi Cutter from Darda shows its strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility lines, as well as in the recycling of metal beams and cables in scrap yards.

Darda
Multi Cutters

News and
Stories

Job Report C12 – HCS8 – Underwater demolition Underwater demolition of concrete piles Read more
Job Report Rock- and Concrete Splitter C9 Tunneling Tunnel extension in a dam Read more
Job Report Rock and Concrete Splitter C12 – Concrete Pillars Cutting of concrete pillars in 5 minutes Read more
Job Report Tank Cutter TC120 – Environmental Engineering Dismantling a tank 8 m length x 1.8 m height Read more