Within one day this 8 m long and 1.80 m high tank was completely dismantled and disassembled by the company Zeuner Umwelttechnik GmbH.
Flame cutting and exhaust fumes were not allowed in this underground garage – perfect conditions for the Darda tank cutter in combination with an electric remote controlled Brokk demolition robot.
Cutting force
of 60 tons
Darda Tank Cutter TC120 continuously cut through the 6 mm thick steel in one continuous cut and with a cutting force of 60 tons.
Cold
continuous
cutting
Due to its cold cut, even coated tanks with residual contents are no problem.




















