Products | Combi-Shears | HCS8 S
Darda
Combi-Shears
make the
difference
Materials up to Ø 16 mm
Nearly noiseless, low vibration and low dust
Compact and light
Economical
Safe cut
27.2 t cutting force
A complete
Combi-Shear
consists of three
components:
1. Hydraulic Combi-Shear
2. Hydraulic Power Unit
3. Hydraulic hose set (high and low pressure)
Combi-Shear
HCS8 S
Equipped with the Sickle Blade set, the HCS8 S can cut through pipes, round materials, disused power cables, profiles made of sheet metal or wood and steel reinforcements up to Ø 16 mm. Here it is guaranteed that the shears cannot slip off the material to be cut.
The very powerful Combi-Shear work quickly and productively. One person can easily handle the compact and lightweight device. The integrated control valve allows sensitive control of closing and opening. The working process can be controlled at any time. It causes no dust, no vibrations and is extremely quiet. This means that it can also be used indoors without hesitation and does not interfere with ongoing operations.




















