Products | Multi Cutters | MC200
Darda
Multi Cutters
make the
difference
Controlled cutting
Safe use
High productivity
Small carriers
Powerful in confined spaces
Stability guaranteed
Break-up work
at a high level
The compact and powerful Multi Cutter from Darda shows its strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, supply lines and pipes, as well as in the recycling of metal structures and cables in scrap yards.




















