Steel Shear
CC440 S

1
2
3
4

Steel Shear
CC440 S

1
Hydraulic rotary drive

Simple, precise and efficient positioning for best results.

2
Pivot bearing for 360° rotation

For mechanical positioning.

3
Integrated pressure booster

Full cutting force independent of the input pressure of the carrier.

4
Exchangeable cutting heads

Increase productivity by shortening machine downtime and reducing maintenance costs.

Products  |  Steel Shears  |  CC440 S

Darda
Steel Shears
make the
difference

Controlled demolition

Low noise, dust and vibration.

114 t cutting force

Independent of carrier pressure.

Small carriers

Limited access/load no problem.

204 mm large opening width

For easy positioning.

Powerful in confined spaces

Small, compact with great cutting power.

Internal coring made easy

Optimal for large steel pipes.

Specifications
CC440 S

Weight
275 kg
Jaw opening
204 mm
Recommended carrier weight
3 - 6 t
Cutting force C, max.
1123 kN (114 t)
Data sheet CC440 S | PDF | 65 KB
Catalog | PDF | 17 MB

Options

For
carriers
from 3 - 6 t

Compact with
strong cut

Darda’s compact and powerful steel shears show their strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility pipes, as well as in the recycling of metal beams in scrapping yards.

Darda
Steel Shears

News and
Stories

Job Report C12 – HCS8 – Underwater demolition Underwater demolition of concrete piles Read more
Job Report Rock- and Concrete Splitter C9 Tunneling Tunnel extension in a dam Read more
Job Report Rock and Concrete Splitter C12 – Concrete Pillars Cutting of concrete pillars in 5 minutes Read more
Job Report Tank Cutter TC120 – Environmental Engineering Dismantling a tank 8 m length x 1.8 m height Read more