Merchandise

Take a look at our merchandise products and order directly to be perfectly equipped for customer visits and exhibitions.

Only for our dealers!

Produkt erfolgreich zum Warenkorb hinzugefügt!

Hoodie

  • Hoodie・black・Darda Designlogo
  • Material: 80% cotton, 20% polyester (grey melange: 90% cotton, 10% viscose)
  • Grammage: 320 g/m²
– +

T-Shirt

  • T-Shirt・black・Darda Designlogo
  • Material: 100% cotton (Sports Grey: 85% cotton, 15% viscose)
  • Grammage: 180 g/m²
– +

Polo-Shirt

  • Polo-Shirt・black・Darda Logo
  • Material: 100% cotton
  • Grammage: 190 g/m²
– +

Truckercap

  • Truckercap・black/white・Darda Designlogo
  • Material: 47% cotton, 28% nylon, 25% polyester
– +
Price: 11.90 €

Basecap

  • Basecap・black・Darda Logo
  • Material: 100% polyester
– +
Price: 7.50 €

Beanie (Designlogo)

  • Beanie・black・Darda Designlogo
  • Material: 63% polyester, 32% cotton, 5% elastane
  • Grammage: 170 g/m²
– +
Price: 8.90 €

Beanie (Weblable)

  • Beanie・black・Darda Weblable
  • Material: 63% polyester, 32% cotton, 5% elastane
  • Grammage: 170 g/m²
– +
Price: 7.40 €

Beanie (Knitted)

  • Knitted Beanie・black・Darda Logo
  • Double layer
  • Material: 100% polyacrylic
– +
Price: 8.90 €

Tube Scarf

  • Tube Scarf・black・Darda Logo
  • Material: Polyester
  • Grammage: 145 g/m²
– +
Price: 2.90 €

Backpack

  • Backpack・blue・Darda Logo
  • Versatile backpack with a functional design
  • Size: 25 Litre
– +
Price: 49.00 €

Cotton Bag

  • Cotton Bag・black・Darda Logo
  • Illustration: Outline Concrete Crusher
  • Size: 38 x 42 cm
– +
Price: 2.40 €

Cotton Backpack

  • Cotton Backpack・black・Darda Logo
  • Material: cotton
  • Grammage: 140 g/m²
  • Size: 37 x 46 cm
– +
Price: 5.80 €

Bottle

  • Bottle・black・Darda Logo
  • Size: 0,5 Litre
  • The insulated 18/8 stainless steel keeps drinks hot or cold for several hours
– +
Price: 12.70 €

Keytool

  • Keytool・silver・Darda Logo
  • Multifunctional tool is equipped with 21 useful functions
– +
Price: 8.70 €

Lanyard

  • Lanyard・black・Darda Logo
  • Material: Polyester
  • Size width: 20 mm
  • With safety lock
– +
Price: 1.90 €

Folding Rule

  • Folding Rule・cyan ・Darda Logo
  • Size: 2 Metre
– +
Price: 4.80 €

Ballpoint Pen

  • Ballpoint Pen・black/blue・Darda Logo
  • Writing colour: blue
– +
Price: 0.80 €

Pencil

  • Pencil・white・Darda Logo
  • oval, 240 mm, sharpened, medium-hard lead
– +
Price: 0.60 €

Writing Pad (A5)

  • Writing Pad・white・Darda Logo & adress
  • DIN A5 (148 x 210 mm), 50 sheets, 90 g/m², chequered
– +
Price: 1.20 €

Writing Pad (A4)

  • Writing Pad・white・Darda Logo & adress
  • DIN A4 (210 x 297 mm), 50 sheets, 90 g/m², chequered
– +
Price: 2.30 €

Product catalog

  • Product catalog
  • Take a look inside – Download
  • DIN A4
  • 80 pages
– +

Brochure: Hydraulic Splitters

  • Brochure: Hydraulic Splitters
  • Take a look inside – Download
  • DIN A4
  • 12 pages
– +

Brochure: Handheld Demolition Equipment

  • Brochure: Handheld Demolition Equipment
  • Take a look inside – Download
  • DIN A4
  • 12 pages
– +