Hydraulic
Power Unit
EP3

1
2
3
4
5
6
7
8
9
10

Hydraulic
Power Unit
EP3

1
Two-stage pump for max. productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
Connection option 230 V and 400 V with selector switch

Two plug connections provide full flexibility on the job site. Does not apply to EP2 110 V.

3
High quality motor

With extra large control box in which all capacitors are stowed.

4
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

5
Closed hydraulic system

All parts run in oil.

6
Manifold for up to 3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

7
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

8
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

9
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

10
Clad steel frame

New designed Metal housing for best protection under rough working conditions

Hydraulic
Power Unit
EP3

1
2
3
4
5
6
7
8
9
10

Hydraulic
Power Unit
EP3

1
Two-stage pump for max.
productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
Connection option 230 V and
400 V with selector switch

Two plug connections provide full flexibility on the job site. Does not apply to EP2 110 V.

3
High quality motor

With extra large control box in which all capacitors are stowed.

4
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

5
Closed hydraulic system

All parts run in oil.

6
Manifold for up to
3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

7
Robust steel frame with wheels
and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

8
Integrated storage box

Integrated storage box for accessories (tools, special lubricant, chain)

9
Lifting eyes

Mounted lifting eyes for 4-leg sling chain (Example see below)

10
Clad steel frame

New designed Metal housing for best protection under rough working conditions

Products  |  Hydraulic Power Units  |  EP3 230 V / 400 V

Darda Hydraulic
Power Units make
the difference

Safety

Parallel overpressure protection systems with knock-off valve.

Mobility

Easy for one person to transport and fits in any car trunk.

Productivity

Reliable and fast due to 2-stage pump.

User-friendly

Robust and easy to use.

High performance

High pressure 50 MPa.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
EP3 230 V / 400 V

Weight
55 kg
Power system
Electric
Flow rate low-pressure stage
5 l/min
Flow rate high-pressure stage
1,6 l/min
Filling capacity oil tank
5 l
Data sheet EP3 230 V / 400 V | PDF
Catalog | PDF | 17 MB

Mounted lifting eyes
for 4-leg sling chain

Accessories

Quick couplings

Safety box (GFCI ground fault circuit interrupter)

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Drada EP3 Aggregat

Emission free
for indoor and
outdoor areas

Electric drive

EP3 230 V / 400 V – emission-free
high pressure up to 500 bar

EP3 230 V / 400 V
emission-free high pressure
up to 500 bar

By combining the two most common electrical connection types 230 V and 400 V in one device, the EP3 offers maximum application possibilities. The type of connection used can be determined via a selector switch. The EP3 operates 100% emission-free and is therefore particularly suitable for indoor use.
Even the stricter future health and safety requirements for exhaust fumes and noise can be complied with. The EP3 is the reliable solution for all areas where conventional gasoline or diesel units are prohibited due to their exhaust emissions.

Our electrically driven high-pressure unit has two parallel overpressure protection systems. A two-stage pump enables rapid pressurisation of the connected tool and thus improves its productivity. Up to 3 tools can optionally be connected to the pre-assembled manifold and operated in parallel.

Integrated wheels and an extendable handlebar facilitate transport within the building. Suitable lifting eyes are located on the unit for uncomplicated crane transport using a “4-leg sling chain”. In addition to the compactness of the unit, the clad steel frame ensures optimum protection in rough working conditions. The tools required to use the hydraulic terminal devices are safely stored in the integrated storage box.

Ruggedly designed for heavy-duty demolition applications, the EP3 supplies the hand-held demolition tools from Darda with a system pressure of 500 bar. The compact dimensions enable uncomplicated transport to the job site.