Multi Cutter
MB200 Rebar Cutter

Darda MB200 Bolzenschneider
1
2
3

Multi Cutter
MB200 Rebar Cutter

1
360° hydraulic rotary drive

Easy positioning of the cutting blades with high precision.

2
Slim design

Rugged and compact, for easy handling even in hard-to-reach places.

3
Easy and quick replacement of cutting inserts​

The cutting inserts can be replaced easily and quickly, minimizing downtime​.

Multi Cutter
MB200 Rebar Cutter

Darda MB200 Bolzenschneider
1
2
3

Multi Cutter
MB200 Rebar Cutter

1
360° hydraulic rotary drive

Easy positioning of the cutting blades with high precision.

2
Slim design

Rugged and compact, for easy handling even in hard-to-reach places.

3
Easy and quick replacement of cutting inserts​

The cutting inserts can be replaced easily and quickly, minimizing downtime​.

Products  |  Multi Cutter  |  MB200 Rebar Cutter

DARDA
MULTI CUTTERS
MAKE THE
DIFFERENCE

Controlled cutting

Solid material up to Ø32 mm (S355)

Safe use

Low noise, dust and vibration.

High productivity

Easy and quick replacement of cutting inserts​

Small carriers

Limited access/load – no problem.

Powerful in confined spaces

Small and compact with up to 210 t cutting force​

Stability guaranteed

Safe pulling down and lifting of installations.

Specifications
MB200 Rebar Cutter

Weight
165 kg / 263 lb
Jaw opening
110 mm / 4.3 in
Recommended carrier weight
1.2 - 2.8 t / 2640 - 6160 lb
Cutting force, max.
2059 kN (210 t) / 462840 lbf
Data Sheet MB200 | PDF | 255 KB
Catalog | PDF | 17 MB

high-strength rebar
up to Ø 32 mm

For
carriers
up to 1.2 - 2.8 t

MB200 Rebar Cutter –
Powerful, Safe Cutting Without Sparks​

With the new MB200 Rebar Cutter, we are introducing a tool unlike anything currently on the market:​
a compact hydraulic bolt cutter capable of reliably cutting high-strength rebar up to Ø 32 mm (ASTM A615 #10) using a cold-cutting process – with no sparks and no open flame.​

While cut-off grinders, saws, or oxygen lances pose significant risks for the user, the MB200 Rebar Cutter delivers maximum safety performance even in demanding conditions.​ Developed for demolition, dismantling, and the precise cutting of reinforcing steel, it delivers maximum cutting power in an exceptionally easy-to-handle format.

Thanks to its compact design, the MB200 Rebar Cutter operates powerfully and cleanly even in tight or hard-to-reach areas –​ a new, high-performance tool for professionals who need to cut steel quickly, safely and reliably.​

Darda
Multi Cutters

News and
Stories

Job Report C12 – HCS8 – Underwater demolition Underwater demolition of concrete piles Read more
Job Report Rock- and Concrete Splitter C9 Tunneling Tunnel extension in a dam Read more
Job Report Rock and Concrete Splitter C12 – Concrete Pillars Cutting of concrete pillars in 5 minutes Read more
Job Report Tank Cutter TC120 – Environmental Engineering Dismantling a tank 8 m length x 1.8 m height Read more