Steel Shear
CC440 S
					 
						
						
								1
							
						
								2
							
						
								3
							
						
								4
							
						Steel Shear
CC440 S
					
										1
									
								
									Hydraulic rotary drive
								
								
							Simple, precise and efficient positioning for best results.
										2
									
								
									Pivot bearing for 360° rotation
								
								
							For mechanical positioning.
										3
									
								
									Integrated pressure booster
								
								
							Full cutting force independent of the input pressure of the carrier.
										4
									
								
									Exchangeable cutting heads
								
								
							Increase productivity by shortening machine downtime and reducing maintenance costs.
Products | Steel Shears | CC440 S
Darda
Steel Shears
make the
difference
		Controlled demolition
114 t cutting force
Small carriers
204 mm large opening width
Powerful in confined spaces
Internal coring made easy
Compact with
strong cut
		Darda’s compact and powerful steel shears show their strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility pipes, as well as in the recycling of metal beams in scrapping yards.





















 
								 
								 
							 
									 
									 
						 
						 
						 
						 
							 
							