Products | Hydraulic Power Units | EP3 230 V / 400 V
Darda Hydraulic
Power Units make
the difference
Safety
Mobility
Productivity
User-friendly
High performance
Low maintenance costs
Mounted lifting eyes
for 4-leg sling chain
Accessories
Quick couplings
Safety box (GFCI ground fault circuit interrupter)
By combining the two most common electrical connection types 230 V and 400 V in one device, the EP3 offers maximum application possibilities. The type of connection used can be determined via a selector switch. The EP3 operates 100% emission-free and is therefore particularly suitable for indoor use.
Even the stricter future health and safety requirements for exhaust fumes and noise can be complied with. The EP3 is the reliable solution for all areas where conventional gasoline or diesel units are prohibited due to their exhaust emissions.
Our electrically driven high-pressure unit has two parallel overpressure protection systems. A two-stage pump enables rapid pressurisation of the connected tool and thus improves its productivity. Up to 3 tools can optionally be connected to the pre-assembled manifold and operated in parallel.
Integrated wheels and an extendable handlebar facilitate transport within the building. Suitable lifting eyes are located on the unit for uncomplicated crane transport using a “4-leg sling chain”. In addition to the compactness of the unit, the clad steel frame ensures optimum protection in rough working conditions. The tools required to use the hydraulic terminal devices are safely stored in the integrated storage box.
Ruggedly designed for heavy-duty demolition applications, the EP3 supplies the hand-held demolition tools from Darda with a system pressure of 500 bar. The compact dimensions enable uncomplicated transport to the job site.




















