Ep3 110 V / 60 Hz – Emission-free
high pressure up to 500 bar
Archive (Page 1 of 3)
Multi Cutter MB200 Rebar Cutter
Reliably cutting high-strength rebar up to Ø 32 mm using a cold-cutting process
Hydraulic Power Unit BP3
Consistent energy for industrial and construction environments.
Hydraulic Power Unit AP3
Hydraulic Power Unit AP3 1 2 3 4 5 6 7 8 9 Hydraulic Power Unit AP3 1 Two-stage pump for max. productivity of demolition tools Short cycle times thanks to low-pressure pump combined with high-pressure pump. 2 Maintenance unit Clean and dry air supply to the engine ensured by read more...
WIDA AB C20-T4
Drilling & splitting in one machine for maximum efficiency
Steel Shear CC440 S
Compact with a strong cut
Hydraulic Power Unit EP3 230 V / 400 V
Ep3 230 V / 400 V – Emission-free
high pressure up to 500 bar
Rock and Concrete Splitter C10S
C10S – the accurate splitter for
natural stone quarrying
Multi Cutter MC300 Cable Cutter
Highest cutting force with low weight
Combi-Shear HCS8 S
Combi-Shear HCS8 S 1 2 3 4 Combi-Shear HCS8 S 1 Hydraulic hoses with burst protection Robust multi-layer hoses reliably connect the Combi-Shear with the high-pressure hydraulic power unit, which delivers a system pressure of 50 MPa (500 bar). 2 Sensitive control valve (safety mechanism) Due to the control valve read more...




















