Products | Concrete Crushers | CC480
Darda
Concrete
Crushers
make the
difference
50 t crushing force
Small carriers in confined spaces
460 mm large opening width
Low noise demolition
187 t cutting force
Additional crushing tips
Compact and
powerful
Darda’s compact and powerful Concrete Crusher show their strength especially in indoor demolition in very confined spaces, during running operations or in busy environments, but also as an all-round Concrete Crusher in many other applications. With significantly lower emissions compared to other demolition methods in terms of noise level, shocks and vibrations, you work safely and effectively!
The Darda CC480 can be upgraded – depending on the type of work to be done – with hydraulic rotary drive and additional crushing tips.




















