Products | Combi-Shears | HCS8 B
Darda
Combi-Shears
make the
difference
Multifunctional
Nearly noiseless, low-vibration and low-dust
Compact and lightweight
Economical
32 cm masonry breaking
45 cm spreading width
A complete
Combi-Shear
consists of three
components:
1. Hydraulic Combi-Shear
2. Hydraulic Power Unit
3. Hydraulic hose set (high and low pressure)
Combi-Shear
HCS8 B
The HCS8 B Brick Jaw can be used to break off masonry up to 32 cm thickness. It replaces the conventional sledgehammer and, thanks to its hydraulic operation, is much more effective and very easy to use. There are simply fold-out steel tips on the Brick Jaws. With them, the HCS8 B can also spread a wide variety of materials and, for example, break door and window frames out of the masonry.
The very powerful Combi-Shear work safely, quickly and productively. One person can easily handle the compact and lightweight device. The integrated control valve allows sensitive control and locking of closing and opening. The working process can be controlled at any time. It causes no dust, no vibrations and is extremely quiet. This means that it can also be used indoors without hesitation and does not interfere with ongoing operations.




















