Products | Hydraulic Power Units | BP2
Darda Hydraulic
Power Units make
the difference
Safety
Mobility
Productivity
User-friendly
High performance
Low maintenance costs
Accessories
Quick couplings
Safety box (GFCI ground fault circuit interrupter)
BP2 – independent
high pressure
With the BP2 portable gasoline high-pressure hydraulic power unit, you are always quickly ready for operation and independent of other operating sources. It is very compact and therefore fits easily in the car or van. Lightweight and handy, it supplies the Darda handheld demolition equipment with a system pressure of 500 bar. The Honda professional engine was characterized by very low fuel consumption. With the pre-mounted manifold, up to 3 devices can be connected and operated in parallel. Integrated wheels and an extendable handle bar makes transport within the building easier. Optional ergonomic carrying aids also simplify transport for 2 persons. The gasoline-powered high-pressure hydraulic unit is EPA and CARB certified and popular with demolition contractors and rental companies equally.




















