Hydraulic
Power Unit
BP2

1
2
3
4
5
6

Hydraulic
Power Unit
BP2

1
Two-stage pump for max. productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
High quality engine

Durable, fuel-efficient Honda engine ensures safe operation.

3
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

4
Closed hydraulic system

All parts run in oil.

5
Manifold for up to 3 device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

6
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

Hydraulic
Power Unit
BP2

1
2
3
4
5
6

Hydraulic
Power Unit
BP2

1
Two-stage pump for max.
productivity of demolition tools

Short cycle times thanks to low-pressure pump combined with high-pressure pump.

2
High quality engine

Durable, fuel-efficient Honda engine ensures safe operation.

3
Filtration integrated in tank

Intake, return, and filling filters ensure protection of the pump and unit for maximum lifetime.

4
Closed hydraulic system

All parts run in oil.

5
Manifold for up to 3
device connections

One coupling set low/high pressure mounted as standard – expandable to 3 sets.

6
Robust steel frame with wheels and extendable handle

Extendable handle and solid rubber wheels for easy relocation in the building or on the construction site.

Darda Hydraulic
Power Units make
the difference

Safety

Parallel overpressure protection systems with knock-off valve.

Mobility

Easy for one person to transport and fits in any car trunk.

Productivity

Reliable and fast due to 2-stage pump.

User-friendly

Robust and easy to use.

High performance

High pressure 500 bar.

Low maintenance costs

Durability due to high quality of well-known component suppliers.

Specifications
BP2

Weight
45 kg
Power system
Gasoline
Flow rate low-pressure stage
5 l/min
Flow rate high-pressure stage
1.6 l/min
Filling capacity oil tank
5 l
Data sheet BP2 | PDF | 184 KB
Catalog | PDF | 17 MB

Accessories

Carrying aid for two persons

Quick couplings

Safety box (GFCI ground fault circuit interrupter)

Hydraulic
Power Untis can
be combined with
any type of Splitters
and Combi-Shears

Hydraulic
Power Untis
can be combined
with any type of
Splitters and
Combi-Shears

Independent
from energy
Sources

Gasoline drive

BP2 – independent
high pressure

With the BP2 portable gasoline high-pressure hydraulic power unit, you are always quickly ready for operation and independent of other operating sources. It is very compact and therefore fits easily in the car or van. Lightweight and handy, it supplies the Darda handheld demolition equipment with a system pressure of 500 bar. The Honda professional engine was characterized by very low fuel consumption. With the pre-mounted manifold, up to 3 devices can be connected and operated in parallel. Integrated wheels and an extendable handle bar makes transport within the building easier. Optional ergonomic carrying aids also simplify transport for 2 persons. The gasoline-powered high-pressure hydraulic unit is EPA and CARB certified and popular with demolition contractors and rental companies equally.