Plaster renovation

Plaster renovation denotes the professional repair of interior and exterior plasters on masonry and concrete. It spans from removing damaged plaster layers and preparing the substrate to installing new, functional plaster build-ups. In practice, plaster is often the visible result of preceding works: moisture damage, salt-laden plinth zones, cracks, delaminations, or corrosion-related spalling on reinforced concrete surfaces must first be exposed and removed in a controlled manner. In comprehensive refurbishments, these steps extend into gutting works, controlled demolition, and concrete repair. In the context of plaster renovation, tool-based solutions from Darda GmbH are also used—for example, a Combi-Shears HCS8 for concrete removal in existing structures or a hydraulic wedge splitter for low-vibration separation and non-explosive rock removal in sensitive areas. The goal is always a load-bearing, cleanly prepared substrate as the basis for durable plaster systems.

Definition: What is meant by plaster renovation

Plaster renovation refers to the systematic identification of damage on plaster surfaces, the removal of non-load-bearing layers, and the restoration of a functional plaster build-up. This includes diagnostics (moisture and salt content, pull-off strength, crack analysis), selecting suitable removal methods, substrate preparation (cleaning, surface roughness, load-bearing capacity) as well as applying new plaster coats through to surface coatings. Plaster renovation therefore covers both aesthetic and building-physics tasks such as moisture protection, vapor diffusion, and minimizing thermal bridges. In existing buildings, plaster works are often linked with portions of concrete demolition and special demolition: for example, exposing corroded reinforcement on façades, removing overly thick cement plasters, or opening connections as part of gutting works and concrete cutting. At such interfaces, precise, low-dust, and low-vibration working methods are critical to protect the structure.

Causes and damage patterns on plaster surfaces

Typical causes of plaster damage include moisture and salt exposure (rising damp, splash water, condensation), thermal and hygric stresses, improper preparatory work, inadequate adhesion between plaster and substrate, unsuitable materials, or movements within the structure. They manifest as delaminations, spalling, efflorescence, cracks (crazing, shrinkage and settlement cracks), sanding, or discoloration. On reinforced concrete surfaces, there are additional corrosion-induced delaminations of the concrete cover area that must be properly removed and reprofiled before actual plaster repair.

Practical approach: from diagnosis to the new surface

A targeted plaster renovation follows a structured sequence that protects the building fabric and increases the service life of the plaster system.

1. Investigation and planning

  • Survey of the existing condition: mapping cracks, delaminations, spalling, and moisture ingress.
  • Testing: pull-off tests, drill dust test, conductivity measurement, moisture and salt analysis, review of details (connections, plinths, window reveals).
  • Defining the intervention depth: specifying which areas are to be exposed down to sound substrate; establishing protection measures (dust suppression, vibration limits).

2. Removal of damaged existing plaster and local concrete removal

  • Mechanical plaster removal with handheld tools, matched to the substrate and damage pattern.
  • On concrete surfaces: expose corroded reinforcement and remove loosely adhering concrete. In practice, a concrete demolition shear is used to create controlled edges, tabs, or breakouts without introducing unnecessary vibration into the structure.
  • In adjacent masonry and concrete areas that must not be completely demolished, hydraulic wedge splitters—such as hydraulic rock and concrete splitters—enable low-vibration material separation or non-explosive rock removal—useful in sensitive environments such as hospitals, schools, or listed buildings.

3. Substrate preparation

  • Cleaning (dust, release agents, salts) and producing suitable surface roughness.
  • Corrosion protection and passivation of exposed reinforcement; reprofiling with suitable mortars.
  • Pre-wetting mineral substrates and, if necessary, applying a dash coat to improve bond.

4. Building up the new plaster system

  • Selecting the plaster system according to moisture and salt exposure (e.g., renovation plaster systems in plinth zones, lime or lime-cement plasters where vapor diffusion is required).
  • Installing reinforcement layers in crack-prone areas; observing connection details, drip edges, and splash-water protection.
  • Final coatings according to use and exposure, including adequate drying and curing times.

Material selection and system build-up: compatible and physically coherent

Material compatibility between plaster mortar, substrate, and coating is central. On salt- and moisture-exposed surfaces, sorptive, capillary-active, and vapor-permeable layers are preferred so that moisture can dry out and salts are buffered. Lightweight, porous plaster mortars reduce stresses; lime and lime-cement plasters support vapor diffusion and alkalinity. In critical zones, reinforcement mesh helps distribute stresses. A coherent layer build-up is important: load-bearing substrate, if applicable a dash coat, base and leveling coats, finishing plaster, and suitable coating. On reinforced concrete surfaces, the rules of concrete repair apply for reprofiling and surface protection before building up plaster layers.

Machinery in the context of plaster renovation

Although the actual plaster application is craft work, the choice of technology for deconstruction and exposure decisively influences quality:

  • Concrete demolition shear: For selective removal of concrete cover, opening edges, and safely exposing reinforcement in façade and slab areas. It supports a precise workflow with low vibration levels in existing structures.
  • Hydraulic wedge splitter (incl. rock wedge splitter): For low-noise, low-vibration separating or non-explosive rock removal of massive components in the immediate vicinity of intact plaster surfaces—for example, when enlarging reveals, removing overly thick cement plaster shells, or demolishing small concrete projections.
  • Hydraulic power pack: Energy supply for hydraulic tools indoors when electric or combustion-engine alternatives are restricted for emission or safety reasons (Power Units).
  • Hydraulic shears, multi cutters, steel shears: In gutting works and when cutting built-in parts (profiles, meshes, fixings) prior to plaster renovation, to release connections in a controlled way.
  • Cutting torch: In industrial repurposing, media-carrying tanks and pipelines can be professionally separated in advance before adjacent plaster and concrete surfaces are repaired.

This machinery is assigned to the application areas of gutting works and concrete cutting as well as concrete demolition and special demolition. Under special boundary conditions (hospital operations, historic preservation, densely populated neighborhoods) it is adapted as a special operation to protect the structure, users, and surroundings.

Special boundary conditions: sensitive existing fabric, historic preservation, operation within buildings

In sensitive projects, low vibrations, dust control, and noise reduction measures are paramount. This applies to buildings in operation as well as historic façades. Hydraulic wedge splitters enable quiet, controlled separating operations, while a concrete demolition shear notches specific component areas precisely without endangering large plaster fields. Transport routes, load transfer, and logistical constraints in existing structures must be clarified early. Surfaces must not be secondarily damaged by water and dust; therefore extraction, containment, and organized material flows are part of work preparation.

Occupational safety, environment, and disposal

Work on plaster surfaces can release dust, fine quartz fractions, or old coatings. Protective measures (respiratory protection, dust extraction, wetting, containment) must be determined for the project. If hazardous legacy materials are suspected (e.g., asbestos-containing plasters/fillers, or old coatings containing lead or PCB), prior investigations and suitable procedures must be planned, including asbestos remediation where applicable. Plaster and concrete debris must be collected separately and disposed of according to the applicable regulations. Water from wet cleaning must be retained and treated to prevent entry into the soil or sewer. Such notes are general and do not replace project-specific planning.

Quality assurance and documentation

  • After removal: verification of load-bearing capacity and surface roughness, inspection of exposed reinforcement and concrete quality.
  • During execution: compliance with mix ratios, layer thicknesses, waiting times, and ambient conditions (temperature, humidity, wind).
  • After completion: pull-off tests, moisture and salt monitoring for renovation plasters, visual inspection of surface quality.
  • Documentation: damage mapping, photo sequences, test protocols, materials and batch numbers used, information on the equipment employed (e.g., concrete demolition shear, hydraulic wedge splitter) and their parameters.