Construction logistics

Construction logistics comprises the holistic planning, control, and monitoring of all material, equipment, and personnel flows on construction sites. It ensures that the right resources are available at the right time in the right place—from construction site setup through delivery and disposal processes to the return of equipment. Especially in concrete demolition, in special demolition as well as in rock excavation and tunnel construction, precise construction logistics is crucial because access is limited, construction site safety requirements are high, and takt times are tight. Tools and systems from Darda GmbH such as concrete demolition shear as well as rock wedge splitter and concrete splitter (rock and concrete splitters) place specific logistical demands on energy supply, space management, and processes—while enabling low vibration levels and controlled processes.

Definition: What is meant by construction logistics

Construction logistics is the interaction of strategic planning and operational execution of all logistical processes on a construction site. This includes materials management, equipment provision, traffic and access control, storage and space management, disposal and recycling logistics, energy and media supply, and information flows. The aim is to execute construction and deconstruction processes safely, on schedule, economically, and in an environmentally compatible manner. In projects with concrete demolition, building gutting and cutting operations, rock breakout, tunnel construction, or natural stone extraction, construction logistics takes into account not only schedules and quantities but above all equipment characteristics (e.g., hydraulics performance for the hydraulic power pack, routing of the hydraulic hose line, equipment masses), load-bearing capacity of areas and structures, emission limits, and regulatory requirements.

Core processes and tasks of construction logistics

Construction logistics structures construction and deconstruction projects into manageable, coordinated workflows. It plans ahead, controls in real time, and documents for traceability. Key areas of responsibility include:

  • Construction site setup: Access routes, storage and transshipment areas, loading zones, route guidance, lifting devices, media connections
  • Inbound logistics: Coordinated delivery time windows, slot management, unloading concepts, inner-city traffic control
  • Equipment management: Selection, availability, maintenance, energy supply (e.g., hydraulic power pack), deployment scheduling by takt
  • Material flow: Just-in-time/just-in-sequence, intermediate storage, buffer zones, interfaces between trades
  • Disposal and waste disposal logistics: Source-separated construction waste separation, container- and route-optimized removal, traceability
  • Occupational and environmental protection: Noise control measures and dust suppression, low vibration levels, safe traffic routes, construction emergency plan
  • Documentation and control: Quantity recording, delivery notes, equipment and operating hours, utilization, evidentiary records

Construction logistics in deconstruction: Specifics in concrete demolition and special demolition

Deconstruction projects require finely tuned logistics because structures are often worked on while adjacent areas remain in use, in densely built environments, or in sensitive surroundings. Construction logistics coordinates the sequence of building gutting, cutting, separating, and removal, aligned with structural conditions and safety zones.

Selective material flow

In selective deconstruction, construction materials are separated at the point of origin. The logistics concept defines containers, routes, and pickup rhythms for concrete, reinforcing steel, masonry, wood, plastics, and hazardous substance. Short, crossing-free routes reduce accident and dust risks.

Working with low vibration levels

When vibrations must be minimized, methods with controlled force transmission come into focus. Here, the concrete demolition shear enables separating “biting” of reinforced concrete with limited vibration. Rock wedge splitter and concrete splitter work with wedge principle or cylinder systems that build stresses in the material, splitting quietly and precisely—advantageous near sensitive infrastructure.

Energy and media supply

A safe, high-performance supply of hydraulic pressure, electrical power, and, where applicable, water is essential. The hydraulic power pack is positioned in construction logistics so that the hydraulic hose line is short, trip hazards are minimized, and ventilation and exhaust routing are considered. Appropriate hydraulic power units should be selected to match available power and duty cycles. Maintenance windows and spare parts supply are integrated into takt planning.

Planning equipment deployment: Concrete demolition shear, rock wedge splitter, concrete splitter, and other systems

The selection and logistical deployment of tools influence takt times, emissions, and space requirements. Important criteria in the planning process are:

  • Accessibility: Opening width, reach, safety distance, setup areas
  • Load-bearing: Load-bearing capacity of floor slabs and supports, temporary shoring, thresholds for point and distributed loads
  • Energy demand: Drive power, electrical connection ratings, load profiles, redundancies
  • Emission limits: Noise emission, dust exposure, low vibration levels, sparks during steel cutting and tank cutting
  • Material flow: Quantity and size of arising pieces, gripping and haulage logistics concepts
  • Safety: Barriers, load and hazard zones, emergency stop, media shutdowns

Concrete demolition shear in concrete demolition

The concrete demolition shear is used in building gutting, in the separating deconstruction of components, and in selective concrete demolition. Logistically important are setup and swing areas, protection against spalling, coordination with lifting devices, and takt-accurate disposal of the broken concrete and steel fractions.

Rock wedge splitter and concrete splitter in controlled demolition

With limited vibrations or in structurally critical areas, rock wedge splitter and concrete splitter allow for the step-by-step opening of components. Logistically, drilling patterns, splitting sequence, wedge or cylinder logic, escape route, and the safe handling of resulting fragments must be planned.

Hydraulic power packs and interfaces

The hydraulic power pack supplies the concrete demolition shear, hydraulic shear, Multi Cutters, steel shear, and tank cutters. Construction logistics determines set-down areas, hose routing, protection against damage, as well as refueling and maintenance operations. Short routes and clear markings increase safety and productivity.

Application areas and their logistical requirements

Concrete demolition and special demolition

Here, tight time windows, restricted space, and high safety requirements dominate. Construction logistics sets up unloading and loading zones, schedules disposal vehicles by takt, and coordinates equipment deployment with barriers and dust protection measures.

Building gutting and cutting

In buildings with active use, noise emission, dust exposure, low vibration levels, and fire protection must be precisely managed. Cutting operations are integrated with disposal logistics and fire protection watches. For concrete demolition shear and Multi Cutters, load-bearing routes and ceiling load capacity must be verified in advance.

Rock excavation and tunnel construction

In tunnel cross-sections and rock areas, tunnel ventilation, air ducting, lighting, and emergency exit are key. Rock splitting cylinders enable controlled removals; appropriate rock splitters are selected based on geology and access. Logistics plans the sequence of borehole drilling, splitting, mucking, and conveying in the takt of the tunnel face.

Natural stone extraction

Rock wedge splitter and concrete splitter support the extraction and sizing of natural stone blocks. Decisive are organized haulage logistics, weather-protected storage areas, and safe routing for heavy loads.

Special operations

For operations under special conditions—such as in confined inner-city locations, heritage-protected areas, or industrial facilities—permits, neighborhood protection, escape routes, and emissions management must be closely linked with the deployment planning of concrete demolition shear, steel shear, and tank cutters.

Space and traffic management on the construction site

Space is scarce and must be used multiple times. Construction logistics plans structurally suitable intermediate storage, safe traffic routes, and applies one-way concepts to minimize crossings. For heavy components, temporary protection and load distribution plates are provided.

Delivery time windows and slot management

Staggered deliveries prevent congestion and downtime. Digital pre-advice, clear entry instructions, and defined unloading points reduce search and waiting times. Special time windows apply to hazardous goods (ADR) and hot works.

Energy and media logistics

The provision of electrical power, hydraulic pressure, compressed air, and water is aligned with equipment performance and takt. For the hydraulic power pack, load profiles, peak loads, and redundancy are considered. Media routes must be secured, labeled, and regularly inspected.

Maintenance and operational readiness

Predictive maintenance prevents failures. Construction logistics plans inspection intervals, spare parts supply, oil and wear part management, and regulated service activities outside peak times.

Occupational, environmental, and neighborhood protection

Safety and environmental protection are integral components of construction logistics. Measures for dust suppression, limiting vibrations, and noise control measures should be planned early. Barriers, guidance and warning systems, load and restricted zones, as well as clear rescue and escape routes increase safety.

Disposal and recycling logistics

Source-separated construction waste separation and documented removal are fundamental. Suitable containers and pickup rhythms are specified for concrete, steel, plastics, and other fractions. The goal is to increase reuse and the recycling rate.

Planning depth, takt, and information flows

Clear takt planning structures the construction process. Model-based quantity takeoff, digital delivery notes, and continuous quantity tracking create transparency. Interfaces with subcontractors are defined with clear responsibilities, handover points, and time windows.

KPIs and control

Performance indicators such as delivery punctuality, waiting and changeover times, equipment utilization, mass flows, downtimes, and emission values support control. Continuous improvements reduce costs and risks.

Practical guide: Implement construction logistics step by step

  1. Clarify the starting point: Boundary conditions, permits, emission limits, load-bearing capacity
  2. Plan processes: Takts, delivery windows, equipment and personnel scheduling, waste disposal logistics
  3. Organize spaces: Access routes, storage, loading zones, media routes, barriers
  4. Coordinate equipment deployment: concrete demolition shear, rock wedge splitter and concrete splitter, hydraulic power pack, lifting devices
  5. Safety and environment: Protective measures, briefings, construction emergency plan, documentation
  6. Control and follow up: Record KPIs, analyze deviations, adjust measures

Interface management with trades and authorities

Successful construction logistics thrives on coordination. Regular communication with executing trades, disposal companies, and—where necessary—authorities ensures clear responsibilities. Time-critical work such as cutting, splitting, or tank dismantling is scheduled into permit-compliant time windows and harmonized with traffic and neighborhood management.