Helmut Bouillon
Technical Sales Engineer

- Phone: +49 7702 4391 -33
- E-Mail: HBO@darda.de
- LinkedIn: Helmut Bouillon | LinkedIn
Professional Profile
Helmut Bouillon (B.Eng) has been Technical Sales Engineer at Darda GmbH since March 2024, an international manufacturer of demolition technology headquartered in Blumberg, Germany.
The role of Technical Sales Engineer covers a broad spectrum of technical and commercial responsibilities with direct customer interaction in Germany and abroad. He conducts start-up trainings for handheld and machine-mounted tools and provides technical application consulting by phone, e-mail, and on site. He serves as contact for traded goods and acts as a coordinator between internal departments and external partners.
Core tasks also include training dealers and sales partners domestically and internationally, as well as demonstrating products in-house or directly at customer sites. In exceptional cases, he performs repairs on construction sites to ensure equipment availability. He supports field sales and dealers with technical inquiries and accompanies special projects, contributing to concept development, preliminary development, cost estimation, and post-calculation.
Furthermore, he processes international complaints and prepares for and participates in trade fairs to present products and identify market trends. He actively contributes to the continuous improvement of existing products and their customer value and prepares technical documentation—both for internal purposes (e.g., ERP data, specifications, test/inspection protocols) and for external use such as instructions or quick-start guides.
In close coordination with the sales management, he decides whether inquiries or custom solutions are pursued or declined. For such projects, he prepares technical drawings as specified and defines the technical requirements for quotations. Additionally, he conducts market research, identifies new trends, and compiles analyses and statistics to support the company’s strategic direction.
Career & Qualifications
Since 03/2024: Technical Sales Engineer, Darda GmbH
- Start-up trainings for handheld and machine-mounted tools
- Application consulting by phone, e-mail, and on site (domestic and international)
- Sales and service training for dealers (domestic and international)
- Product demonstrations in-house and on site
- Repairs on construction sites when required
- Development and testing of prototypes
- Support for the continuous improvement of existing products and product benefits
2010: Degree
B.Eng Konstruktion und Entwicklung
Duale Hochschule Baden-Württemberg Stuttgart, Campus Horb am Neckar
The DHBW Campus Horb is characterized by its close integration of theory and practice, personal supervision in small groups, and a modern, nature-oriented learning environment, offering excellent career opportunities through close cooperation with numerous partner companies.
Core Competencies
- 15 years of experience in the design and development of machinery and equipment
- Prototype construction and testing
- Project management
- Internal and external trainings on products and processes
- Supporting sales and dealers with problem solving and product selection
Philosophy & Approach
I am an engineer by passion—driven by enthusiasm for technology and the ambition to always find the most efficient and technically best solution for our customers. Creativity and practical relevance shape my work: I do not only design in theory, but also test and optimize my designs myself—directly in the workshop or on the construction site.
This practical approach is also reflected in my trainings. I convey technical knowledge in a vivid, application-oriented way with real-world relevance so that theory and practice fit together seamlessly.




















