Breakout

The term breakout describes the targeted loosening, removal, or separation of material from a solid composite such as concrete, masonry, or rock. In practice, the spectrum ranges from small-scale edge breakout to large-volume rock breakout in tunnel construction and special foundation engineering. For predictable results, the selection of suitable methods and tools is decisive — for example, the use of hydraulic rock and concrete splitters for low vibration levels rock and concrete removal or concrete pulverizer for selective deconstruction with a controlled fracture pattern. The systems are powered by mobile hydraulic power units and are used in different application areas from concrete demolition to natural stone extraction.

Definition: What is meant by breakout

Breakout is understood as the controlled extraction of material from a massive structural element or geological formation by mechanical, hydraulic, chemical, or thermal action. In concrete and reinforced concrete construction, this includes, among other things, concrete breakout at edges and openings, the exposure of reinforcement, and the partial dismantling of components. In rock and tunnel construction, rock breakout refers to producing muck along a planned breakout contour. The goal is a reproducible fracture pattern with minimal impairment of the remaining structure, low emissions, and high occupational safety.

Breakout in concrete and rock construction: methods and distinction

Breakout differs from purely separating processes such as sawing or drilling in that material is released from the bond by fracture. Depending on the objective, fracture is induced by hydraulic splitting (wedge/cylinder principle), gripping and crushing with shears, shear cutting, or combinations thereof. In practice, methods are combined: pre-drilling, splitting to relieve stresses, followed by biting with a concrete pulverizer or recutting of reinforcement. This makes it possible to deliberately control geometry, edge quality, and residual load-bearing capacity — from selective deconstruction in existing structures to large-area rock breakout in tunnel excavation.

Methods of breakout and their suitability

Hydraulic splitting with hydraulic splitter

In splitting, rock-splitting cylinders use wedges to generate high, locally acting tensile stresses in the borehole, causing the material to crack in a controlled manner. Advantages are low vibration levels, low noise emission, and a well-controllable fracture pattern. This is ideal for concrete demolition in existing structures, rock breakout in sensitive environments, as well as for natural stone extraction with blocky, marketable formats.

Concrete pulverizer for selective deconstruction

Concrete pulverizer grip, crush, and break out concrete components in a controlled manner. They allow the exposure of reinforcement, the successive biting off of edges, and the creation of openings without large-scale crack propagation. In combination with steel shear or multi cutters, exposed reinforcement can be cut efficiently. The method is particularly suitable for concrete demolition and special demolition as well as gutting works.

Combination shears and multi cutters

Combination shears and multi cutters combine crushing and cutting functions. They are used when mixed materials (concrete with inserts, masonry, light sections) occur during breakout. They complement concrete pulverizer in fine breakout and when separating embedded components.

Steel shears

Steel shear take care of cutting reinforcing steel, sections, and sheets that are exposed during breakout. In this way, the breakout in concrete remains controlled while metallic components can be cleanly separated.

Cutting torch for special operations

Where vessels, pipelines, or hollow bodies with special requirements regarding sparks and heat input are encountered during breakout, cutting torch are considered. They enable close-to-cut work within the scope of special operations and gutting works when breakout services are required in parallel.

Application areas: where breakout is needed

Concrete demolition and special demolition

In deconstruction of existing structures, controlled concrete breakout is central to avoid unintentionally weakening load reserves and to protect adjacent components. Concrete pulverizer enable step-by-step material removal, while hydraulic splitter open up large components with low internal stresses. Hydraulic power pack supply the tools as required, even under confined conditions.

Gutting works and cutting

Before structural demolition, installations, claddings, and small-format components are removed. Light shears, multi cutters, and steel shear support this. For openings in concrete with limited edge distance, a combined approach of drilling, splitting, and biting can improve the edge quality of the breakout.

Rock demolition and tunnel construction

In underground construction, the breakout cross-section is produced by sequences of loosening, loading, and securing. Hydraulic splitting with rock-splitting cylinders or rock splitters is a non-explosive rock removal alternative when vibrations must be avoided. After loosening the muck, edges can be re-profiled to achieve the specified contour.

Natural stone extraction

For marketable blocks, a straight fracture pattern is decisive. Splitter act on natural joints to guide the breakout along preferred planes. After the primary breakout, shaping is carried out with pulverizers or subsequent processing.

Special operations

In sensitive areas such as hospitals, laboratories, or near core zones, low emissions are crucial. Low-vibration splitting technology and finely controllable concrete pulverizer reduce noise, dust, and vibration. Cutting torch are additionally used for the safe separation of hollow bodies.

Planning and dimensioning of the breakout

A robust concept takes into account material properties, component geometry, reinforcement, and surroundings. Important parameters are:

  • Compressive and tensile strength of the material, moisture content, joint and crack pattern
  • Reinforcement ratio, bar diameter, cover, and position of inserts
  • Drilling pattern for splitter (diameter, depth, spacing, edge distances)
  • Shear parameters (jaw opening, crushing force, blade geometry) and accessibility
  • Hydraulic data (pressure, flow rate) and compatibility of tool and power unit
  • Environmental boundary conditions: permissible vibrations, noise, dust, working hours

Early coordination with planners and site management helps to limit breakout effects on the remaining load-bearing structure. Where necessary, temporary shoring, relief measures, or cut sequences can increase safety.

Quality of the breakout and rework

The quality of the breakout is reflected in edge appearance, absence of cracks, dimensional accuracy, and the protection of adjacent components. Concrete pulverizer enable dosed biting of edges, while splitter produce a calm fracture pattern. Rework includes removing loose components, chamfering edges, targeted recutting of reinforcement with steel shear, as well as preparing suitable bonding surfaces for later connections or concrete repair.

Process in practice: step by step

  1. Survey of existing conditions: record material, reinforcement, utilities, load transfer, and surroundings
  2. Method selection: define splitting, shears, cutter, or a combination
  3. Cutting and splitting plan: define drilling pattern, gripping points, load transfer, and sequence
  4. Exposure: remove utilities and attachments, secure the working area
  5. Primary breakout: set splitting cylinders or start removal with concrete pulverizer
  6. Secondary breakout: profile edges, recut reinforcement, separate sections
  7. Sorting and transport: remove concrete, steel, and rock separately with coordinated haulage logistics
  8. Rework and inspection: check the surface, remove loose parts, dismantle protective measures

Safety, emissions, and environmental protection

Breakout work requires a careful hazard analysis, especially regarding falling parts, crushing and shear points, hydraulic pressure, and dust and noise emissions. Hydraulic splitting and the use of concrete pulverizer are considered low vibration levels and help protect sensitive neighborhoods. Dust suppression by wet methods and dust extraction, shielding against fragments, and coordinated lifting device logistics are recommended. In potentially hazardous atmospheres, suitable procedures and, where applicable, ATEX zone clearances must be taken into account; statements here are always general and without case-specific assessment.

Typical mistakes and how to avoid them

  • Insufficient exploration of reinforcement: leads to uncontrolled concrete breakout and tool wear
  • Edge distances too small when drilling: promotes edge spalling
  • Overdimensioned forces: unnecessary crack formation; better to increase load step by step
  • Missing sequence planning: parts jam or load the remaining structure
  • Inappropriate tool choice: working with a concrete pulverizer instead of a hydraulic splitter (or vice versa) worsens the fracture pattern
  • Insufficient securing: falling pieces endanger personnel and surroundings

Technical parameters and selection criteria

Key parameters for tool selection include: splitting force and stroke for rock-splitting cylinders, jaw opening and crushing force for concrete pulverizer, cutting force for steel shear, as well as the required hydraulic pressure and flow rate of the hydraulic power pack. Also practically relevant are the tool size and weight, accessibility, hose routing, operating concept, and the desired degree of selective material separation.

Special boundary conditions and special operations

In environments with strict requirements — for example in heritage-listed buildings, near vibration-sensitive systems, or with restricted access — hydraulic splitter and concrete pulverizer play to their strengths. They enable controlled breakout with reduced emissions and can be complemented with additional tools such as combination shears, multi cutters, steel shear, or cutting torch to form a complete solution. In this way, breakout, separation, and disposal can be organized from a coordinated approach without losing focus on safety and component protection.