
PRODUCT OVERVIEW
TANK CUTTER
Type | TC120 |
Device carrier (t) | 3 - 8 |
Brokk demolition robot (type) | 260 |
Weight (kg) | 270 |
Opening width (mm) | 125 |
Connection (bar / l/min) | 175 - 270 / 100 |
Cutting force (kN / t) | 660 / 60 |
Cutting capacity structural steel (mm) | Plate t = 15 |
Pipe Ø95x5 | |
Cutting capacity stainless steel (mm) | Plate t = 12 |
Hydraulic unit | +++ |
Rotary unit | +++ |
Replaceable wear parts | +++ |
+++ available, - not available
Don't cut cast iron