Products | Hydraulic Power Units | AP2
Darda Hydraulic
Power Units make
the difference
Safety
Mobility
Productivity
User-friendly
High performance
Low maintenance costs
Accessories

Carrying aid for two persons

Quick couplings

Safety box (GFCI ground fault circuit interrupter)

AP2 – safe
high pressure
The AP2 portable high-pressure hydraulic unit with compressed air allows you to work even in sensitive areas where electric and gasoline engines are prohibited. It is very compact and fits in any car or van. Light and handy, it supplies Darda handheld demolition equipment with a system pressure of 500bar. The robust air motor, equipped with a silencer, has a maintenance unit that ensures the functional reliability and a long lifetime of the unit. With the pre-mounted manifold, up to 3 units can be connected and operated in parallel.
Integrated wheels and an extendable handle bar makes it easy to transport the unit within the building. Optional ergonomic carrying aids also simplify transport for 2 persons.
The compressed air-driven high-pressure hydraulic unit is used in sensitive areas where electric and gasoline engines are prohibited.