Multi Cutter
MC300
1
2
3
Multi Cutter
MC300
1
360° hydraulic rotary drive
Easy positioning of the cutting blades with high precision.
2
Slim design
Rugged and compact, for easy handling even in hard-to-reach places.
3
Exchangeable cutting blades
Easy maintenance, thanks to exchangeable cutting blades.
Products | Multi Cutters | MC300
Darda
Multi Cutters
make the
difference
Controlled cutting
Safe use
High productivity
Small carriers
Powerful in confined spaces
High stability
Highest
cutting force
with low
weight
The compact and powerful Multi Cutter from Darda shows its strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility lines, as well as in the recycling of metal beams and cables in scrap yards.




















