Steel Shear
CC420 S

1
2
3
4
Steel Shear
CC420 S
1
Hydraulic rotary drive
Simple, precise and efficient positioning for best results.
2
Pivot bearing for 360° rotation
For mechanical positioning.
3
Integrated pressure booster
Full cutting force independent of the input pressure of the carrier always guaranteed.
4
Exchangeable cutting heads
Increase productivity by shortening machine downtime and reducing maintenance costs.
Products | Steel Shears | CC420 S
Darda
Steel Shears
make the
difference
Controlled demolition
75 t cutting force
Small carriers
145 mm large opening width
Powerful in confined spaces
Internal coring made easy
Compact with
strong cut
Darda’s compact and powerful steel shears show their strength especially in internal coring in very confined spaces, during operation or in busy environments, in the field of industrial demolition when cutting steel structures, utility pipes, as well as in the recycling of metal beams in scrapping yards.