Construction waste recycling refers to the professional processing of mineral waste from construction, deconstruction, and refurbishment into reusable building materials. The focus is on concrete, masonry, natural stone, and mixed construction debris, which, after demolition, are crushed, sorted, and returned to the materials cycle as so-called recycled construction materials. Key to achieving high quality are selective deconstruction, efficient size reduction, and clean material separation. Tools such as concrete demolition shears or stone and concrete hydraulic splitters as well as suitable hydraulic power units make a major contribution in concrete demolition and special demolition because they enable low-contaminant, low-vibration, and precise working methods.
Definition: What is meant by construction waste recycling
Construction waste recycling encompasses the entirety of technical, organizational, and legal measures to transform mineral construction waste into replacement building materials of suitable quality. This includes the phases of selective deconstruction, collection, transport, processing (crushing, screening, separation), quality monitoring, and re-use. The goals are conserving natural resources, reducing landfill volumes, and minimizing environmental impacts through short transport distances and targeted circularity. Depending on the source material, recycled construction materials are used, for example, as base layers, crushed stone base layers, frost protection layers, or—when quality permits—as aggregate in concrete.
Process chain in construction waste recycling: from deconstruction to recycled construction material
The path from an existing structure to a finished recycled building material follows a structured process chain. The more consistently materials are separated already during deconstruction, the easier the subsequent processing becomes. Mechanical methods such as splitting and shear demolition support the pure recovery of concrete and masonry fractions, which are later efficiently classified and provided as recycled construction material.
Material types and material flows at a glance
Construction debris is not a uniform material but a mixture of mineral and non-mineral components. Crucial for processing is the assignment to fractions that are as pure as possible:
- Pure concrete (reinforced concrete, plain concrete)
- Masonry (brick, calcium silicate units, autoclaved aerated concrete), partly mixed with render
- Natural stone (granite, limestone), often from natural stone extraction or deconstruction of retaining walls
- Mixed debris (concrete–brick blends), which requires additional sorting steps
- Asphalt and other bituminous layers, to be handled separately
- Interfering materials: wood, plastics, metals, gypsum, insulation, soil portions, contaminated materials
The quality of the recycled construction material directly depends on the purity of the mineral fraction. Selective work with concrete demolition shears, combination shears, and steel shears facilitates the separation of reinforcing steel, utilities, and built-ins already on site.
Selective deconstruction: quality starts before processing
Selective deconstruction is the foundation of successful construction waste recycling. The aim is orderly dismantling and separation of building materials before size reduction begins. In the strip-out and cutting phase, non-mineral building materials are removed, utilities are disconnected, and built-ins are taken out.
Tool selection and approach
- Concrete demolition shears: precise breaking of concrete components, controlled removal of cover concrete and exposure of reinforcement; advantageous in concrete demolition and special demolition.
- Stone and concrete hydraulic splitters and rock wedge splitter: low-vibration breaking of massive components or rock structures; helpful in sensitive areas as well as in rock excavation and tunnel construction.
- Combination shears and Multi Cutters: versatile cutting tasks on steel sections, reinforcing bars, and light metal components.
- Steel shear and cutting torch: cut thick-walled steel beams and vessels in special operations; for tanks only after proper cleaning and degassing.
- Hydraulic power packs: provide continuous pressure and flow rate for the above tools and ensure repeatable working speeds.
By combining splitting, shear demolition, and cutting, concrete parts are reduced to reusable sizes while interfering components such as reinforcement, installations, or claddings are separated. This significantly reduces the effort required for stationary processing.
Crushing, screening, and separation
After deconstruction, the actual processing begins. The goal is a defined gradation with low levels of interfering and harmful substances.
Principles of size reduction
- Splitting instead of blasting: stone and concrete hydraulic splitters and rock splitters create controlled cracks and separate massive cross-sections with low vibration—ideal in vibration-sensitive environments or in tunnel construction.
- Nibbling and crushing: concrete demolition shears break up components, open edges, and reduce size for screening and crushing processes.
- Crushing: mobile or stationary jaw/impact crushers to produce defined size classes.
Screening and classification
Screening plants provide size fractions (e.g., 0/8, 8/16, 16/32, 32/X). Well-matched screening technology improves particle shape, gradation, and blending and directly influences bearing capacity and compactability of recycled construction materials.
Metal and contaminant separation
- Magnetic separators remove reinforcing steel and metal parts.
- Air classifiers and trommel screens reduce light contaminants such as films, wood, or insulation residues.
- For mixed debris: additional manual sorting to ensure purity.
Quality assurance and standards classification
The quality of recycled construction materials is safeguarded by regular testing. Common checks include particle size distribution, fines content, density, freeze–thaw–deicing salt resistance, and unwanted constituents. Recognized technical rules apply to use in base layers, frost protection layers, or bulk fills. For use as aggregate in concrete, special requirements apply depending on region and application; these include, among others, strength, mortar and brick content, and potential reinforcement and chloride issues. Requirements may change; concrete interpretation should always be project-specific and supported by expert testing.
Factors for consistent recycled material quality
- Segregated collection of concrete, masonry, and natural stone
- Gentle size reduction that maintains particle shape and strength
- Reliable metal separation and removal of gypsum/insulation
- Documented in-house and third-party monitoring of production
Applications of recycled construction materials
Recycled building materials are used in numerous construction phases, provided the technical requirements are met:
- Unbound base layers and frost protection layers in road construction
- Subgrade protection layers and backfills
- Bulk material for excavation pit leveling and site grading
- Drainage and capillary break layers, depending on gradation
- Aggregates in concrete when quality requirements are met and evidenced
Careful matching of gradation curve, moisture balance, and compaction energy is crucial. Recycled concrete is proven in components with defined exposure classes, provided suitability is professionally verified.
Site organization: construction logistics, emissions, and occupational safety
Efficient construction logistics increases the recycling rate and reduces costs. Short routes, clear material flow, and low-emission methods are especially important in urban areas.
Logistical principles
- Separate containers/boxes for concrete, brick, metals, gypsum, and interfering materials
- On-site size reduction with concrete demolition shears and hydraulic splitters for volume reduction
- Just-in-time haulage to the recycling plant
Reducing emissions
- Dust suppression through water misting and well-chosen size-reduction methods
- Noise reduction measures through splitting technology and targeted shear demolition
- Low vibration levels (splitting) near sensitive neighboring structures
In tunnel construction and special operations, also ensure ventilation, gas-free condition (for tanks), control of sparks, and fire protection. Occupational safety requirements must be followed; specific measures depend on the location and the hazard analysis.
Connection to typical application areas
The choice of method depends on the task and the target quality of the recycled material:
- Concrete demolition and special demolition: concrete demolition shears cut load-bearing members in a controlled manner; reinforcement is exposed and can be separated with steel shears. This increases the concrete share of the mineral fraction.
- Strip-out and cutting: Multi Cutters and combination shears separate mixed materials before the mineral substance is processed. Hydraulic power packs ensure constant performance.
- Rock excavation and tunnel construction: stone and concrete hydraulic splitters as well as rock wedge splitters enable low-vibration rock release, improving material quality for subsequent classification.
- Natural stone extraction: controlled splitting produces gradation-stable fractions that are well suited as recycled bulk material.
- Special operations: cutting torches are used on metal tanks—only after proper preparation. This keeps mineral and metallic material flows cleanly separated.
Technology in detail: splitting and shear demolition
Mechanical splitting applies high forces in defined boreholes and creates directed crack patterns. This reduces oversize, protects adjacent components, and yields piece sizes that are easy to process. Shear demolition works gently on materials and enables step-by-step reduction of component thicknesses. Combined with metal separation by steel shears, homogeneous concrete or masonry fractions with low contaminant content are produced.
Hydraulics as the key
Hydraulic power packs supply concrete demolition shears, splitters, and shears with stable pressure. Proper sizing according to oil flow, operating pressure, and duty cycle improves performance, energy efficiency, and tool service life.
Planning and tendering: practical guidance
Considering construction waste recycling early in planning and tendering improves outcome quality. Recommended:
- Construction material inventory and hazardous substance investigation to identify separation and protection measures
- Definition of separation principles (concrete demolition shear, splitting, cutting) already in the deconstruction concept
- Specifications for recycled material quality, test intervals, and evidence in the technical specifications document
- Coordinated logistics: access routes, intermediate storage, dust protection, and noise control
- Define return paths for recycled construction materials to minimize transport distances
Cost-effectiveness and environmental impact
Construction waste recycling conserves primary raw materials, reduces landfill capacity requirements, and lowers transport emissions. Cost-effectiveness depends on purity, local distances, and the efficiency of size reduction and sorting. Methods using stone and concrete hydraulic splitters or concrete demolition shears often reduce side effects (dust, noise, rework) and thus improve the overall balance—particularly in inner-city deconstruction or complex existing structures.
Typical challenges and how to address them
- High brick or mortar content: affects frost resistance; manageable through selective separation and adjusted screening.
- Gypsum and sulfates: separate early to avoid later efflorescence.
- Reinforcement remnants: remove consistently with magnetic separation and steel shears.
- Fines content: control via process management and screening to ensure compactability.
Practice-oriented checklist for high-quality construction waste recycling
- Selective deconstruction with clear material flows before size reduction begins
- Targeted use of concrete demolition shears and hydraulic splitters for gradation-stable pre-crushing
- Safe separation of metals, gypsum, and organic constituents
- Matched screening and classification to suit the application
- Documented quality assurance and project-specific suitability evidence
- Minimize emissions (dust, noise, vibration) with appropriate methods




















