Tank Cutter
TC120
Tank Cutter
TC120
Easy positioning of the tank cutter.
Regardless of the input pressure of the carrier, the full cutting force is thus always guaranteed.
Allows curve cutting for the best result.
Exchangeable and dynamic cutting blades for more productivity even with thin material.
Exchangeable and static cutting blades for more productivity even with thin material.
Products | Tank Cutter TC120
Darda
Tank Cutter
makes the
difference
Cold, pulling cutting
20 cm one cut
Adjustable cutting gap
60 t cutting force
Highly productive and low noise
Small carriers in confined spaces
Cold
continious cut
Designed for safe cold cutting of steel tanks and plates up to 15 mm thick, the tank cutter is our alternative to flame cutting or cut-off grinding. Whether in scrapping, crushing metal structures, as an addition in industrial demolition or in confined internal demolition/coring – the robust booster system made by Darda makes this possible even with small carrier equipment. No matter if railroad wagons, grain, water, oil and fuel tanks the tank cutter guides itself in the cutting gap without slipping out in the continuous cut, which is up to 20cm per cut. Thanks to the conical neck, a curved cut is also possible.
Due to its “cold, pulling” cutting action, even coated tanks with residual contents can be cut easily without the risk of flammable vapors! Thus, effective and safe working is possible even during running operations or in busy environments.




















