A transport rack is a central link between tool, machine, and logistics in day-to-day demolition, deconstruction, and quarrying operations. It protects heavy hydraulic tools, simplifies handling on the construction site, and reduces downtime. Especially for concrete demolition shears as well as rock and concrete splitters (Rock Splitters), a suitable rack enables safe changes between work locations, orderly storage, and standards-compliant transport by crane or forklift.
Definition: What is meant by transport rack
A transport rack is a load-bearing, often stackable frame construction for the safe accommodation, securing, and movement of devices or assemblies. Such a rack provides lifting and lashing points, protects exposed components such as cutting jaws, cylinders, or hydraulic lines, and permits controlled lifting, lowering, and setting down. Transport racks are tailored to the geometry and mass of the tools they carry and are designed for crane, forklift, or vehicle transport. The goal is repeatably safe, ergonomic, and material-friendly movement of the load, from the workshop to the point of use—for example to concrete demolition and special deconstruction, gutting and cutting, rock demolition and tunnel construction, or natural stone extraction.
Design and operating principle of a transport rack
The basic structure consists of longitudinal and transverse beams that transfer the load into the frame and receive the lifting gear. Pads, brackets, and protective strips prevent slipping and protect sensitive edges. For concrete demolition shears, for example, guide shoes, mounting consoles, and impact surfaces are positioned so that the shear self-centers in the rack. For rock and concrete splitters, there are often form-fit pockets that decouple cylinder bodies, hoses, and couplings and protect them against impacts. Crane eyes, cross-sling points, or spreader bars define the lifting path. Fork pockets and fork channels enable near-ground maneuvering. Its operating principle is based on form-fit and force-fit, clearly defined lifting points, and practical guidance of the load.
Typical designs and materials
Transport racks for hydraulic tools are usually welded steel frames. Galvanized or coated surfaces increase corrosion resistance; rubberized pads damp impacts and protect painted surfaces. Compact pallet frames are suitable for hydraulic power packs; taller portal constructions accommodate long shear arms or split cylinders. For storage, stackable racks are often used, which are safely positioned on top of one another by defined stacking pins or bearing-edge zones. The choice of materials is guided by load capacity, operating environment, and desired service life.
Compatibility with hydraulic tools
For a transport rack to convince in everyday use, it must map the tool’s geometry precisely. For concrete demolition shears, this concerns the support of the jaws, securing the rotation units, and routing of hydraulic hoses. With rock and concrete splitters, the split wedge, cylinder, and pressure lines must be protected against kinking. Combination shears, multi cutters, steel shears, and tank cutters require additional protective fields around cutting edges and bearing points. Hydraulic power packs benefit from racks with vibration-damping pads, cable holders, and defined crane points to relieve fluid lines.
Use in concrete demolition and special deconstruction
In lifting situations with changing attachment points, tight time windows, and high tool turnover, a suitable transport rack offers an extra level of safety. Concrete demolition shears can be secured and staged immediately after set-down without damaging the surroundings. Rock and concrete splitters reach the point of use with protected couplings. This reduces setup times, limits transport damage, and supports orderly material flows between loading zone, work area, and intermediate storage.
Rock demolition, tunnel construction, and natural stone extraction
Space is tight in rock and underground environments. Transport racks must be particularly compact, tip-resistant, and easy to grip there. Split cylinders are often staged vertically with secured centering sleeves to speed insertion into boreholes. In natural stone extraction, a robust frame geometry helps to absorb sharp-edged rock contact. Handles, lifting lugs, and color-marked centers of gravity support orientation in poorly lit areas.
Special deployments: contaminated areas and demanding environments
For special deployments, such as with contaminated substances, in coastal environments, or at elevated temperatures, adapted surfaces and wipeable sealing systems are used. Smooth, easy-to-clean pads and closed pockets prevent ingress of dirt. In such conditions, clear labeling is helpful to avoid mix-ups and maintain separate logistics chains.
Safety and load securing
Safety comes first. A transport rack defines attachment points for chains, ropes, or slings and lashing points for vehicle transport. The center of gravity should be visibly marked on the rack so the load does not tip when slinging. For road and plant traffic, anti-slip mats, edge protectors, and form-fit restraints are key. In general, it is advisable to observe the relevant technical rules and company policies; they provide guidance on selection, operation, and periodic inspection of load-handling attachments.
Sizing, load capacity, and center of gravity
The design is based on device weight, payload reserve, and load case. Depending on jaw width and additional adapters, concrete demolition shears can shift the center of gravity; transport racks compensate with offset lifting points or adjustable spreader bars. For rock and concrete splitters, point loads on small supports are critical. Wider, damping supports distribute forces. A clearly legible load capacity marking and documentation of the intended use are essential for safe operation.
Ergonomics and handling
Ergonomics begin with grip span and grasp heights. Casters are rarely the first choice in rough construction environments; robust skids with fork channels have proven themselves. Removable locking pins can be lashed to the rack so they are not lost. Short, unambiguous paths for hose bundles and cables reduce trip hazards and damage.
Maintenance, inspection, and documentation
Transport racks are work equipment with a safety-relevant function. Regular visual inspections for cracks, corrosion, or deformation, as well as checks of lifting points, are advisable. Markings for year of manufacture, tare weight, and load capacity should remain legible. For legally compliant organization, internal documentation of inspection intervals and repairs is recommended, aligned with company policies and the generally accepted rules of engineering practice.
Selection criteria for the right transport rack
Selection starts with the tool: dimensions, weight, and connection points are the basis. Then come the transport routes: crane reach, forklift width, ramp angle, and doorways. The operating environment determines surface protection and damping. For concrete demolition shears, securing the cutting areas is central; for rock and concrete splitters, protecting cylinders and hydraulic connections takes priority. With hydraulic power packs, vibration decoupling and craneability play a major role. A rack that noticeably accelerates logistics pays for itself through shorter setup times and fewer transport damages.
Practice-oriented tips for day-to-day jobsite work
Proactive logistics
Tools should be staged in order of work steps. Markings on the rack help identify the right tool directly. Examples: concrete demolition shear for the initial selective demolition up front; rock and concrete splitter for controlled separation behind it.
Protect hoses and connections
Hydraulic lines should be routed with strain relief and fixed on solid supports. Caps and plugs seal couplings against dust so that power packs and cylinders remain clean.
Protect sensitive components
Cutting edges of concrete demolition shears and multi cutters should not rest on steel. Rubber bumpers or wooden pads prevent notches and extend the service life of tool edges.
Clean, accessible lifting points
Lifting lugs and eyes must be freely accessible. Slung chains must not chafe on edges. With changing sling lengths, color markings help to avoid misuse.
Sustainability and service life
Durable transport racks save resources: robust constructions, replaceable bumpers, and maintenance-friendly joints extend service life. Modular designs enable adaptations when tools change. A well-maintained rack reduces the need for spare parts and lowers downtime, for example when concrete demolition shears or rock and concrete splitters rotate between projects.
Distinction from storage racks
Storage racks serve long-term keeping; transport racks serve safe movement. In practice, both functions are often combined. It is then important that the transport functions—lifting points, fork pockets, tie-down options—are clearly identifiable and adequately sized for the moving load. For workshop storage, additional support strips and drip trays can be useful, especially for hydraulic power packs.
Relation to applications with products from Darda GmbH
Transport racks support safe handling of Darda GmbH products over the entire life cycle: from delivery to storage to daily changeovers on the construction site. Especially with concrete demolition shears, form-fit cradles allow fast, low-damage transport. Rock and concrete splitters benefit from shock-absorbing pads and defined hose routing. Combination shears, multi cutters, steel shears, and tank cutters additionally require edge and tip covers to keep sharp areas protected. For hydraulic power packs, compact frames with clear crane points are suitable to speed changes between workstations.
Planning and organization in operations
Clear assignment of rack to tool prevents mistakes. Unambiguous labels, weight indications, and—if provided—notes on the sequence of lifting points are useful. In project phases with high takt, structured staging-area planning pays off: in- and outbound routes for forklifts, crane zones, and buffer areas. The fewer re-staging moves, the lower the risk of damage.




















