In engineering, the term spool denotes a component that, through linear motion, controls or shuts off flows, forces, or material streams. In hydraulics, the spool usually refers to the valve spool of a directional valve that routes the flow from pressure to the working ports. Especially in hydraulic systems for demolition and rock cutting/processing—such as on concrete demolition shears, rock and concrete splitters, combination shears (e.g., HCS8), or steel shears—the precisely operating spool is a key element for controlled, safe, and efficient workflows. Spools also play an essential role in the valve blocks and control units of Darda GmbH hydraulic power packs.
Definition: What is meant by a spool
A spool is a linearly displaceable control element that connects or separates channels within a housing (valve block, valve body). In hydraulics, the term valve spool is commonly used. It forms the heart of directional valves (e.g., 4/3- or 3/2-way valves). Through the position of the spool, the ports P (pressure), T (tank/return), and A and B (work ports) are interconnected. This allows cylinders to extend or retract, holding functions to be realized, and speeds to be influenced via throttle or proportional functions. Besides the hydraulic valve spool, piping uses the gate valve (gate valve) that shuts off media such as water or air. In the context of hydraulic demolition tools from Darda GmbH, spool generally refers to the valve spool of a directional valve.
Design and operating principle of valve spools
A valve spool is a cylindrical shaft with stepped sealing and control edges that moves with minimal play in a precisely bored sleeve or directly in the valve body. By longitudinal displacement it connects bores or channels. These spool positions define the switching functions of the valve. Typical are:
- Neutral position (center position): e.g., all ports blocked (cylinder holds) or depressurized free flow (freewheel).
- Working position 1: P to A and B to T — the cylinder extends.
- Working position 2: P to B and A to T — the cylinder retracts.
The sealing effect results from tight clearances between spool and bore. A minimal leakage flow is intentionally provided to ensure lubrication and thermal stability. The spool is actuated manually (lever), hydraulically piloted (pilot pressure), electrically by solenoids, or proportionally controlled for fine operation.
Directional valves and spool positions in practice
In hydraulic demolition applications, 4/3-way valves with different center positions are primarily used: center closed (holding function for cylinders on concrete demolition shears), center depressurized (low-energy circulation during idle travel), or center P to T open (protection against heat build-up at standstill). The choice depends on safety requirements, thermal design, and the desired operating feel.
Gate valve versus spool valve
The gate valve in piping serves on/off operation of media lines and is not designed for metering. In high-pressure hydraulics, shut-off functions are mostly implemented by ball valves or seat valves. The controlling spool in directional valves, by contrast, is intended for repeated, finely metered flow distribution—essential when performing precise work with rock and concrete splitters and concrete demolition shears.
Importance in use with concrete demolition shears and rock and concrete splitters
On concrete demolition shears, the spool controls the oil supply to the main cylinders. This defines opening, closing, and positive holding of the shear. A well-designed center position prevents unwanted yielding under load and reduces the risk of component deformation during concrete demolition and special demolition. On rock and concrete splitters, the spool regulates feed and—depending on the system—the switchover between approach and splitting phase. Sensitive control helps initiate cracks in a controlled way, steer stresses, and influence the split direction.
Applications in concrete demolition and special demolition
In day-to-day deconstruction, repeatable motions are crucial. Hand-lever spools enable direct, tactilely well-dosed commands; electrically actuated spools facilitate remote operation and integration into safety circuits. During building gutting and cutting, a stable holding function supports precise positioning, for example when clamping component sections before severing.
Rock breakout, tunnel construction, and natural stone extraction
Dust, moisture, and temperature fluctuations impose high demands on clearance, material, and coating of the spool. In rock environments with varying loads, the spool must minimize stick-slip effects so that splitting cylinders start smoothly and the splitting progress remains predictable. A robust control logic with a clearly defined neutral position helps limit energy losses and keep oil temperature under control.
Types of spools in hydraulics
- Hand-lever directional valves with mechanically actuated spool: simple, robust operation in the field.
- Solenoid-actuated directional valves (on/off): electric actuation, reliable switching points.
- Proportional spool valves: stepless flow-rate control for sensitive movements.
- Pilot-operated directional valves: lower actuation forces, stable at high flow rates.
- Combined valve blocks with integrated spool functions: compact control centers close to the consumer.
Complementary valves and spool functions
Spools are often combined with functional elements: pressure relief and bypass valves protect against load peaks; counterbalance and load-holding valves secure suspended loads and shear positions; flow control valves complement fine control. In modular blocks, these functional elements are arranged close to the spool to minimize response times and pressure losses.
Sizing: dimensioning, flow rate, and pressure loss
The sizing of a spool is determined by the desired flow rate, permissible pressure loss, and required dynamics. Cross-sections that are too small increase Δp and cause heating; oversized cross-sections may impair sensitivity. Viscosity and oil temperature influence throttling behavior. In applications with concrete demolition shears and rock and concrete splitters, a balanced ratio of throughput and controllability is important to enable both fast approach motions and controlled force build-up.
Clearance, leakage oil, and efficiency
The clearance between spool and bore inevitably produces leakage oil. This provides lubrication but reduces volumetric efficiency in holding positions. For holding applications—such as gripping with concrete demolition shears—spools with suitable center positions and complementary load-holding valves are advisable. Clean filtration protects the clearance and control edges, preserves efficiency, and reduces drift.
Control and operating logic
The choice of operating logic depends on the application: direct hand lever for simple, robust control; electric on/off actuation for unambiguous switching; proportionally controlled spools when finely graduated motion is required, for example when carefully closing a shear on reinforced components. A clearly defined neutral position for safe depressurization or holding is essential, depending on site requirements.
Emergency stop, interlock, and safety-related aspects
Spools are integrated into emergency stop and interlock concepts. These include depressurized center positions, interlocks against unintentional actuation, and redundant relief paths. Legal requirements can vary by project, country, and application. It is advisable to design safety circuits according to recognized rules of technology and to test them regularly.
Maintenance and troubleshooting on spools
- Stiff operation or sticking: often due to contamination, abrasion, or corrosion.
- Internal leakage and drift: increased holding yield in cylinders, unstable motions.
- Jerking (stick-slip): insufficient lubrication, unsuitable viscosity, or worn control edges.
- Overheating: excessive pressure loss, continuous circulation without relief, flow misconfiguration.
Root cause analysis and preventive measures
- Check hydraulic oil quality: viscosity, aging, water or air content.
- Monitor cleanliness class: filter condition, change intervals, tightness of connections.
- Verify actuation type: lever mechanism, solenoids, electrical control.
- Assess thermal operating conditions: continuous operation, circulation flows, relief strategy.
- Inspect valve block: freely moving spool, no damage to control edges.
Work on hydraulic systems should be performed by qualified personnel and in compliance with general safety guidelines. Switch to depressurized state, relieve residual energy, and use appropriate protective equipment.
Quality of hydraulic fluid and filtration
A spool only works as precisely as its medium is clean. Particles can widen clearances, abrade control edges, and impair the neutral position. Application-appropriate filtration, suitable viscosity, and cleanliness-class control are indispensable for durable valve blocks in demolition and splitting applications. This keeps cylinder movements repeatable and holding functions stable.
Interfaces to Darda GmbH hydraulic power packs
Darda GmbH Hydraulic Power Units supply pressure and flow for mobile tools. Spools may be integrated in the power pack, in an upstream control block, or directly on the tool. On concrete demolition shears they enable secure holding and powerful closing; on rock and concrete splitters they control feed and the splitting phase. A clear interface definition—regarding working pressure, flow rate, return conditions, and leakage-oil routing—prevents heat input and ensures repeatable results in concrete demolition, building gutting, and rock breakout.
Selection criteria for spools in demolition and splitting technology
- Pressure rating and flow capacity: matched to cylinder areas and required speed.
- Actuation type: hand lever, electric, proportional—depending on operating concept and ergonomics.
- Center position/function: holding, depressurized, through-flow—depending on safety and energy requirements.
- Sealing concept and material: wear resistance, corrosion protection, temperature range.
- Mounting style: integrated valve block, screw-in cartridge, subplate—depending on space and service access.
- Compatibility with hydraulic power packs: pressure relief, return pressure, leakage-oil handling.
Practical examples from the field
Concrete demolition shear in special demolition
When gripping a reinforced component, the spool first sets the shear to fast approach. Shortly before contact, the flow rate is reduced to close in a controlled way. With the center position closed, the shear holds position while the component is secured and then cut. The spool characteristic influences holding capability and response when reopening.
Rock and concrete splitter in natural stone extraction
The spool switches from a fast feed motion to the powerful splitting phase. A defined neutral position limits heat input during crack initiation. With suitable design of the control edges, motions in the splitting cylinder remain uniform, facilitating control over the splitting direction in rock.
Terminological distinctions in mechanical engineering
Outside hydraulics, spool is also used for shut-off fittings in pipelines and for linear machine slides and guides. While gate valves operate in a binary manner (open/closed), hydraulic valve spools are designed for frequent switchovers and finely metered control tasks. For demolition and splitting technology, the hydraulic valve spool is the relevant term.
Standards, symbols, and markings
Hydraulic schematics use standardized symbols for spool positions and directional valves. Generally accepted rules of technology specify execution, safety, and documentation of fluid-technology systems. In practice, this means: clear markings for P, T, A, B; comprehensible switching positions; documented pressure and flow data; and defined maintenance intervals. This keeps equipment in concrete demolition, building gutting, rock breakout, and special demolition predictable and safe.




















