Airtightness

Airtightness is a central topic in deconstruction, interior demolition, and tunnel construction: It determines dust dispersion, air quality, occupational safety, and the controllability of construction site processes in sensitive environments. In areas such as hospitals, laboratories, or occupied buildings as well as underground, reliable airtightness helps limit emissions, direct airflow, and minimize risks. Especially when using hydraulic tools such as concrete demolition shear or hydraulic rock and concrete splitters from Darda GmbH, execution can be planned so that protective enclosures operate reliably and negative-pressure zones remain stable.

Definition: What is meant by Airtightness

Airtightness is the ability of an envelope, a component, or a temporary protective enclosure to prevent uncontrolled air exchange. The aim is to reduce leakage flows through joints, connections, and penetrations to the extent that defined pressure differences and flow directions are maintained. Airtightness differs from water- or oil-tightness and also from gas safety: It is primarily about limiting air movement and thus the ingress or egress of dust, aerosols, and odors. In practice, airtightness of temporary enclosures is checked by visual methods (e.g., smoke tests) and pressure measurements; in rooms, the air change rate can additionally be assessed. Critical are careful connections, tight penetrations, and a robust build that withstands loads from tool operation and material transport.

Importance of Airtightness in concrete demolition and special demolition

In selective deconstruction and complex demolition works, airtight protective enclosures limit dust and fiber emissions. They create a controllable environment for dust extraction and negative-pressure maintenance. Hydraulic methods with concrete demolition shear or hydraulic splitter support this: The material-friendly, controlled removal often generates fewer fine, far-traveling particles compared to percussive methods. As a result, negative-pressure zones remain more stable, filter load decreases, and air quality in adjacent areas improves. In tunnels and shafts, good airtightness also enables targeted guidance of fresh air and shielding of work areas during rock excavation or concrete demolition.

Safely planning airtight protective enclosures and negative-pressure control

Temporary protective enclosures must withstand mechanical loads and remain tight over time. This applies in particular to connections to structural concrete surfaces, joints at ceilings and walls, and penetrations for utility lines and hose bundles. Effective negative-pressure maintenance requires defined low leakage so that exhaust units with pre-filters and HEPA final stages consistently operate within the intended operating range.

Key factors for stable airtightness

  • Enclosure geometry: The simplest possible, minimally penetrated envelopes reduce leakage paths.
  • Connections: Tight, load-transferring bonding on sound substrates; carefully roll down folds and overlaps.
  • Penetrations: Install sleeves, sealing tapes, and zipper doors so that movements of hoses, cables, and carriers do not tear open the seal.
  • Negative-pressure control: Match air capacity to the enclosure volume and leakage; continuously monitor differential pressure.

Tool selection and airtightness: influence of concrete demolition shear and hydraulic splitter

The choice of removal method affects particle generation, airflow, and thus the requirements for the protective enclosure.

  • Concrete demolition shear: Crushing and shearing processes usually produce coarser fragments and fewer fine airborne dusts. This facilitates particle control within airtight enclosures, especially in interior demolition.
  • Hydraulic splitter as well as rock wedge splitter: Controlled widening of cracks enables sectional removal with low secondary dust generation; negative-pressure zones remain more manageable.
  • Combination shears and multi cutters: In reinforced concrete, the combined cutting/shearing process reduces rework with percussive tools; this lowers the airborne load inside the enclosure.
  • Steel shear and tank cutters: For metal removal, airtight enclosures are important to capture and extract aerosols, fumes, and odors in a targeted manner; tightness protects adjacent areas.
  • Hydraulic power pack: Hydraulic drives operate without compressed-air streams at the tool head and promote calm air conditions in the enclosure. Hose penetrations must still be routed airtight.

Fields of application: Airtightness in practice

Interior demolition and cutting

In selective deconstruction within existing buildings, airtight enclosures protect adjacent occupied areas. Concrete demolition shear and combination shears support low-dust removal of slab edges, beams, and wall panels. Zipper doors, airlocks, and differential-pressure-controlled exhaust modules keep particles within the barrier.

Concrete demolition and special demolition

In sensitive environments (e.g., ongoing building operations), airtight protective enclosures limit the spread of suspended particulates. Hydraulic splitter enables gentle release of larger components that are then recovered in a controlled manner. Airtightness facilitates source capture of emissions.

Rock excavation and tunnel construction

Underground, tight enclosures and targeted airflow ensure visibility and breathing air quality. When using rock wedge splitter and concrete demolition shear, work areas can be temporarily separated while the main ventilation controls the flows. This approach aligns with rock demolition and tunnel construction practices. Low-leakage doors and tight line penetrations are particularly important here.

Natural stone extraction

In halls or covered workstations, airtightness minimizes dust release into adjacent zones. Hydraulic splitter contributes to lower-particle removal; capture via local dust extraction points works more efficiently in tight enclosures.

Special applications

When working on tanks, shafts, or contaminated sites, airtight enclosures are crucial for process safety. Tank cutters and steel shear require tight, controlled atmospheres; leaks can undermine the entire protection concept.

Planning and execution: step-by-step to an airtight protective enclosure

  1. Define the protection objective: Specify the desired pressure differential, air changes, and particle retention.
  2. Determine enclosure volume and air capacity: Size exhaust units and filter stages to suit the geometry.
  3. Plan the structure: Consider substrates, connections, load transfer, and tensile forces from door traffic and hose movement.
  4. Coordinate penetrations: Route utility line, hydraulic hose line, power supply, and dust extraction hoses with planned sealing sleeves.
  5. Execution: Install overlaps, tapes, and sealing profiles professionally; secure edges mechanically.
  6. Initial test: Smoke test, visual inspection, and differential pressure measurement; rework leaks.
  7. Operation: Monitor differential pressure, check filter status, regulate traffic flows via airlocks.
  8. Closeout: Cleanliness and visual inspection, dismantle the enclosure without releasing dust.

Building materials and details for airtight solutions

  • Films and membranes: Mechanically robust, tear-resistant materials of sufficient thickness; double up in impact-prone areas.
  • Sealing tapes and sleeves: For cables, hoses, and carriers; accommodate movement without opening the seal.
  • Zipper doors and airlocks: Pressure-stable and tear-out resistant; keep opening times short, plan routing.
  • Profile frames and bracing: Prevent fluttering and gaps under negative pressure and drafts.
  • Transitions to rough substrates: Primer or pre-coats increase tape adhesion on mineral surfaces.

Measurement and quality assurance

Simple, proven procedures are used to check airtightness. A smoke test makes leakage paths visible; manometers show the pressure difference between work and protected areas. Particle measurement tests can demonstrate capture effectiveness. In rooms, methods for determining the air change rate may be used additionally. All measurements should be carefully documented and repeated when the enclosure is modified.

Occupational safety and environmental aspects

Airtightness supports the protection of personnel and the surroundings by limiting emissions and defining airflow. Requirements can arise from generally accepted rules of technology and relevant occupational safety regulations. These vary by application and should be reviewed project-specifically. The content here is general in nature and does not replace a binding case-by-case assessment.

Typical pitfalls and how to avoid them

  • Unplanned penetrations: Subsequent routing without sleeves causes leakage.
  • Overstretched tapes: Tensile forces at corners and door openings cause gaps; reinforce mechanically.
  • Unsuitable substrates: Dusty, damp, or highly absorbent surfaces reduce adhesion; plan substrate preparation.
  • Insufficient air capacity: Undersized exhaust units cannot maintain the pressure differential.
  • Lack of monitoring: Without differential pressure control, leaks often go unnoticed.

Hydraulic power pack, lines, and airtight penetrations

Hydraulic Power Units from Darda GmbH supply concrete demolition shear, hydraulic splitter, combination shears, or multi cutters via hose bundles. These lines must be routed airtight through the enclosure. Flexible sleeves or multi-part sealing flanges permit movement during operation without opening leakage paths. With several parallel penetrations, a shared, reinforced technical passage is often tighter and more robust than many individual openings.

Process organization and documentation

An airtight site enclosure only works in conjunction with orderly workflows. Short door opening times, defined transport routes, intermediate cleaning, and filter replacement plans stabilize pressure conditions. A compact construction record with photos of connections, measurement logs, and approvals facilitates quality assurance and traceability throughout the entire construction phase.