Load plate

The load plate is a central component in the plate load test for assessing bearing capacity, stiffness, and settlement behavior of subgrades and base layers. It transfers a defined load into the ground and enables the derivation of parameters for quality assurance in earthworks, road construction, and civil engineering. For practical applications in concrete demolition, specialist deconstruction, and construction logistics, the load plate is an indirect safety factor: only a subgrade with sufficient load-bearing capacity allows the safe operation of heavy machines and attachments, for example when using concrete demolition shears or rock and concrete splitters from Darda GmbH.

Definition: What is meant by load plate

A load plate is a stiff, usually circular steel plate that serves as a load transmitter in the context of the plate load test (static) or the dynamic plate load test. The plate provides a reproducible contact with the surface so that the deformation properties of the subgrade can be derived from the relationship between the applied stress and the measured settlement. In practice, the load plate is also referred to as a distribution plate or plate disc; however, it is not a structural member in the sense of a concrete slab, but a testing and measuring device for compaction and bearing capacity of layers such as the frost protection layer, unbound base course, or formation level.

Design, dimensions, and materials of the load plate

Load plates are generally made of high-strength steel with sufficient thickness to remain elastic under load and to introduce the load uniformly. Common diameters are about 300 mm (often in the dynamic method) and 600 mm (often in the static method). The underside must be kept flat, clean, and free of damage; slight surface textures or thin inserts serve to ensure defined adhesion on the test surface. To ensure reproducible results, the stiffness, flatness, and cleanliness of the plate are essential. Load transmission is central, often via a spherical head or a hinged bearing to minimize eccentric moments.

Measurement methods: Static and dynamic plate load test

In the static plate load test, the load is applied and removed in steps via a reaction structure (e.g., a ballasted vehicle). From load–settlement curves, parameters such as deformation moduli are derived, typically in two load cycles (“first and second loading”) to assess the compaction state. The dynamic plate load test works with a falling weight; from this, elastic deformations and a dynamic deformation modulus are derived. Both methods serve for immediate on-site control of ground improvement and the quality of unbound layers.

Typical application limits of the methods

The static method represents settlement behavior under quasi-static loading and is preferred for base layers, traffic areas, and heavily loaded work platforms. The dynamic method is mobile, fast, and suitable for areal control, especially for homogeneous layers and access roads. The choice of method should be guided by the required accuracy, layer thickness, and the type of loading expected later.

Use in construction practice: Work platforms, access roads, and deconstruction

Before deploying heavy carrier machines, concrete demolition shears, or rock and concrete splitters from Darda GmbH, load-bearing work platforms, access roads, and staging areas are crucial. Load plate tests provide robust parameters to reduce the risk of inadmissible settlements, tipping hazards, and damage to existing infrastructure. This applies in concrete demolition and specialist deconstruction just as in rock excavation, tunnel excavation, or natural stone extraction, where equipment and aggregates are operated on variable subgrades.

Relevance for concrete demolition shears in concrete demolition

Concrete demolition shears generate high cutting and crushing forces on structural elements, while carrier machines transfer these forces into the subgrade. The resulting contact stresses can be very high locally. A correctly performed load plate test supports the decision as to whether the existing base layer is sufficient or a temporary reinforcement (e.g., additional layer, load distribution mats) is required. This minimizes settlements under crawler undercarriages and keeps construction logistics safe and efficient.

Relation to rock and concrete splitters in rock and tunnel construction

Rock and concrete splitters (e.g., Rock Splitters) operate with low vibration and precision. Nevertheless, drilling rigs, compressors, and hydraulic power units require a stable setup area. Load plate measurements on site access roads, forefields, and storage areas provide the basis for safely managing transport and setup loads, especially under changing weather conditions and on cohesive soils.

Step by step: Conducting a load plate test

  1. Prepare the test surface: level the surface, remove loose particles, record moisture and temperature.
  2. Place and center the plate: ensure the bearing surface is full-contact and clean; use fine sand if needed to compensate for minor unevenness.
  3. Check measuring devices: verify calibration status, sensors, and zero setting.
  4. Load according to specification: define load steps, observe dwell times, record settlements at each step.
  5. Unload and, if applicable, perform a second loading: consider hysteresis and derive deformation moduli.
  6. Document: location, layer buildup, method, parameters, weather, observations.

Evaluation and parameters: Ev1, Ev2, Evd, and settlement behavior

From the measurement data, deformation moduli (e.g., Ev1, Ev2) and, in the dynamic method, a dynamic modulus (Evd) are determined. The ratio of the first to the second loading provides indications of the compaction state. For practice, classification relative to the planned use is crucial: site access roads for medium-duty transports, crane pads, or highly loaded work areas in deconstruction typically require higher stiffness. Specific limit values depend on the project, the agreed standards, and safety requirements; they must always be assessed in the context of layer thicknesses, soil material, and expected point loads.

Distinction: Load plate, load distribution plate, and concrete slab

The load plate in the measurement context is a test tool. Distinct from this are load distribution plates (temporary steel or timber plates) that distribute loads from equipment and aggregates over a larger area, as well as concrete slabs as permanent structural members. In deconstruction scenarios, the combination of load plate measurements and the use of load distribution plates may be necessary to ensure the operational safety of equipment such as concrete demolition shears or rock and concrete splitters.

Quality assurance, documentation, and safety

Sound decisions require careful documentation: location plans with measurement points, layer descriptions, records of weather, dwell times, and readings. For reasons of occupational safety, crushing and tipping hazards must be avoided, reaction vehicles must be correctly ballasted, and test areas cordoned off. Test equipment should be calibrated regularly, and plate surfaces should be inspected.

Common sources of error and practical tips

  • Insufficient surface preparation leads to distorted settlements.
  • Eccentric loading causes tilting load patterns; ensure central force introduction.
  • Too short dwell times underestimate creep and settlement components.
  • Missing weather data hampers comparability.
  • Too few measurement points fail to capture inhomogeneities; choose a representative sample.
  • Contact interface not clean: dust, slurry, or ice falsify the bearing conditions.

Measures in case of insufficient bearing capacity

If the parameters are too low, the following may be considered depending on boundary conditions: recompaction, moisture optimization, layer thickness adjustment, ground improvement, replacement of unsuitable material, or the temporary use of load distribution plates to reduce contact stresses. In demolition and deconstruction projects, an adjustment of construction logistics may additionally be advisable, such as lower point loads, modified travel routes, or preferential use of low-vibration methods. Tools such as concrete demolition shears and rock and concrete splitters from Darda GmbH can be integrated into the work planning in such a way that peak loads on the subgrade are limited.

Standards and organizational notes

The application, evaluation, and assessment of the load plate test are guided by the applicable technical rules and contractual agreements. Specifications for acceptance criteria, test locations, scope, and documentation should be defined on a project-specific basis. Legal requirements may vary depending on region and project; a binding assessment requires review of the relevant documents.