Gusset plate

Gusset plates form the load-bearing link between members, beams, and bracing in many steel and composite structures. In deconstruction, repair, and strip-out, their location, thickness, fastening, and the condition of welded or bolted connections determine the choice of work sequence and separation methods. Especially where steel and concrete are connected, gusset plates influence accessibility and safe exposure—often in direct interaction with concrete pulverizers or with hydraulic rock and concrete splitters from Darda GmbH.

Definition: What is meant by a gusset plate

A gusset plate (also connection plate or gusset strap) is generally a flat steel plate that brings together and distributes the forces of several components at a node. It connects, for example, tension members, diagonals, columns, frame beams, or truss members by means of welds, bolts, or rivets. The plate transfers tension, compression, shear, and bending forces into adjacent sections, limits local stress concentrations, and ensures geometrically clear load transfer. Applications range from hall and bridge structures to stair systems and composite constructions in which steel parts are embedded in concrete.

Configuration, materials, and structural behavior of gusset plates

Gusset plates usually consist of structural steels of common strength classes. Plate thicknesses and edge distances are governed by the required bearing, shear, and tensile resistance at holes as well as fatigue and buckling checks. Force transfer occurs via:

  • bolted connections (bearing at holes, frictional grip, pretension),
  • welded joints (fillet, butt, or partial-penetration welds with joint preparation),
  • historical rivets (shear and bearing).

Functionally decisive are edge distances to holes, copes, stiffening ribs, chamfers, and residual flatness. Surface protection (e.g., coating) and fire protection measures influence the in-service condition—and the separation strategy during deconstruction. In composite designs a gusset plate may be cast in concrete or hidden behind cladding—the access must then be carefully planned in both design and work method.

Gusset plates in existing structures: typical applications

In existing structures, gusset plates appear above all in trusses, frame joints of halls, steel bridges, purlin connections, X-bracing, guardrails, stair constructions, and in steel arch and sheet pile bracing. In tunnel construction they occur in conjunction with steel ribs, shotcrete linings, and temporary bracing. Industrial facilities feature gusset plates in machine frames, platforms, and support frames, which are often fixed in or onto concrete foundations.

Relevance in deconstruction: access, separation, and component securing

For concrete demolition and special demolition as well as for strip-out and cutting, the gusset plate is a central detail. Its position defines load paths and determines where separation is possible without unintended redistributions. In intermediate states, temporary shoring or unloading is often indispensable.

Creating access: exposing gusset plates

If a gusset plate is embedded in concrete or concealed by infill, step-by-step exposure has proven effective. Concrete pulverizers from Darda GmbH separate reinforcement and concrete in a targeted, low-vibration manner with controlled removal. Where robust, low-stress openings are required, hydraulic wedge splitters can induce cracks along defined lines to make the plate accessible without overloading adjacent components. This reveals connected sections, welds, bolt heads, and hole edges, which simplifies the subsequent separation strategy.

Separating plates, sections, and welds

For steel connections, tool selection depends on plate thickness range, weld configuration, and accessibility. Tools such as steel shears for cold separation, combination shears, or multi cutters with high cutting force separate plates, sections, and reinforcement bundles cold and with few sparks. In sensitive areas (e.g., with residual media, tanks, ATEX zones) a Tank Cutter with a spark-reduced process can be advantageous. Layer-by-layer removal of plates minimizes residual stresses and avoids uncontrolled deformations at the joint.

Loosening or cutting bolts, screws, and rivets

Depending on condition, fasteners are loosened or cut. Stuck, corroded bolts can often be cut cold faster than they can be loosened; rivets are usually sheared off or drilled out. The sequence is crucial so the joint does not give way unintentionally. Frequently, non-load-bearing or redundant elements are removed first, followed by controlled separation of the main load paths.

Emissions, safety, and component monitoring

Cold separation methods reduce sparks, heat distortion, and fumes. Where dust is generated (e.g., during exposure in concrete), coordinated extraction and misting concepts help. Node regions are sensitive due to superimposed forces; continuous monitoring for movement, cracking, or pinching is advisable. Temporary securing prevents parts from tipping after the final cut.

Planning: investigation, documentation, and work sequence

The survey of the existing condition comes first. Drawings, material specifications, weld symbols, and bolt grades provide clues about structural behavior and dismantling paths. Where documents are missing, visual inspection, magnetic particle or dye penetrant testing, and plate thickness measurements can help. The work sequence follows the load paths: unload, expose, secure, separate, and sort.

  • Surveying and marking the cuts with regard to stability and crane use,
  • Defining the pick-up points for concrete pulverizers or hydraulic wedge splitters,
  • Defining the sequence for shearing or cutting operations on plate and section,
  • Coordinating lifting and storage points for separated segments.

Typical damage patterns and their implications for deconstruction

With age, gusset plates exhibit cracks at welds or around hole edges (bearing at holes, shear-out deformation), section loss due to corrosion, deformations after impact or installation events, as well as lamellar tearing under thickness-related stresses. Such findings influence cut locations and sequencing. Pre-existing damage can promote unforeseen release of loads; therefore short cut lengths, redundant securing, and stepwise working are advisable.

Load paths, intermediate states, and shoring

A gusset plate bundles forces from several components. When a connection is separated, load paths change immediately. This requires load-bearing intermediate states, e.g., by temporary shoring, struts, or temporary anchorage points. Particularly in trusses, removing a diagonal can transform the system into tension-only members; the shoring must accommodate that. The same applies in tunnel construction to steel rib joints, which must be secured against cross-section constriction.

Tool selection by application

Depending on the environment, Darda GmbH recommends different approaches and suitable tools. Examples:

  • Concrete demolition and special demolition: Expose gusset plates embedded in concrete with concrete pulverizers; targeted unloading or openings with hydraulic wedge splitters; subsequent cold cutting of plates and sections with steel shears or combination shears.
  • Strip-out and cutting: Selective removal of steel joints in buildings with limited emissions; spark-reduced cuts in occupied areas; sectional removal for waste separation.
  • Rock excavation and tunnel construction: During the removal of temporary bracing and steel rib joints, plates are exposed after loosening the shotcrete lining; low vibration is advantageous to avoid affecting the surroundings.
  • Natural stone extraction: Gusset plates occur mainly on conveying systems, platforms, and frame structures; in ongoing operations, spark-reduced, controlled separation methods are in demand.
  • Special operations: In facilities with residual media, on vessels, or in ATEX zones, cold, spark-reduced methods are preferred; the tank cutter complements the portfolio when thermal cutting must be avoided.

Connection geometries and variants in practice

Gusset plates can appear as external straps, plates inserted between flange and web, double-sided gusset packs, or as integral web thickenings. Bolt patterns often follow symmetrical rows with sufficient edge distances; copes take weld access and stress distribution into account. In hybrid constructions (steel to reinforced concrete), end plates, angles, and straps occur in combination with dowels and anchors—the exposure and separation must consider all layers.

Best practices for clean cuts and minimal deformation

  1. Preload and secure: brace and support the joint before the cut.
  2. Cut short, cold, and controlled: prefer spark-reduced shearing and cutting processes, minimize heat input.
  3. Work from the edge toward the center: secondary plates and secondary beams first, main beams last.
  4. Reduce residual stresses: several short cuts instead of one long cut; remove intermediate pieces.
  5. Separate cleanly: separate metal from concrete to facilitate recycling.

Sustainability and resource conservation

Clear separation of gusset plates and connected sections facilitates material recycling. Cold separation methods reduce energy demand and avoid contamination by temper colors or slag. Good documentation of material fractions supports reuse and recycling.

Legal and technical notes in general form

Planning, execution, and deconstruction of gusset plate connections follow the generally recognized rules of steel and composite construction. Specific verifications, safety-relevant decisions, and case-by-case assessments belong in the hands of competent professionals. Information on work methods is to be understood as general, non-binding guidance and must be adapted to the conditions on site.