A wooden scaffold is a temporary construction made of structural timber that serves as a work and protection platform, a support scaffold, or an auxiliary structure in construction. In the context of deconstruction, refurbishment, and strip-out, it enables safe access, materials handling, and the carrying of loads. In many work scenarios where concrete edges are separated with concrete demolition shears or components are split open with stone and concrete splitters, the wooden scaffold forms the nearby work platform and the protected zone for people and materials.
Definition: What is meant by a wooden scaffold
A wooden scaffold is understood to be a scaffold assembled from timber beams, posts, ledgers, decks, and bracing, erected temporarily to enable work on structures or to shore components. It includes working scaffolds for façades, trestle and room scaffolds in interior areas, protective scaffolds against falling objects, as well as support scaffolds (e.g., as formwork carriers or shoring). Unlike modular system scaffolds made of steel or aluminum, a wooden scaffold is often planned project-specifically and built from solid timber, glued laminated timber, or planks; fasteners include nails, screws, clamps, and couplers. Execution follows recognized engineering practice and relevant standards; specific requirements must always be interpreted on a project-specific basis.
Configuration, components, and load-carrying principles
A wooden scaffold consists of vertical posts, horizontal ledgers and decks, and diagonal bracing. Loads are transferred through posts and bearings into the ground; horizontal forces are introduced into the structure via wall anchors or tie-backs. Side protection with handrail, mid-rail, and toe board protects the working level; nets or protective canopies mitigate the risk of falling debris during deconstruction.
Planning, load assumptions, and design
Planning considers self-weight, live loads, transport and erection loads, as well as additional actions from equipment and structural parts. For working levels, load classes (e.g., low to high load classes) and the distribution of point loads from power units or component pieces must be defined. Hydraulic power units, hose bundles, and tools such as concrete demolition shears or stone and concrete splitters generate concentrated loads; these are distributed over pads (bundled planks, ledger bridges). Design and stability verifications are performed by competent persons; the aspects mentioned are general in nature and do not replace structural calculations.
Use in concrete demolition and specialized deconstruction
In concrete demolition, the wooden scaffold serves as a work and protection scaffold along the demolition edge or as an interior platform within floors. When working with concrete demolition shears or stone and concrete splitters, timber scaffolds benefit from the comparatively low vibration levels of these methods compared to impact tools. This improves the stability of the auxiliary structure and reduces the risk of loosening at joints.
Practical measures
- Double-deck scaffold bays beneath equipment with planks and distribute loads across ledgers.
- Secure demolition edges with guard boards, nets, or protective canopies to absorb impact effects and catch falling debris.
- Plan material flow: separate work and drop sides and provide clear routes for removing split concrete.
- Plan pre-positioned anchors for horizontal forces, for example where shear from shear operations occurs.
Wooden scaffold for strip-out and cutting works
During strip-out and cutting in existing structures, wooden scaffolds are used as trestle scaffolds, room scaffolds, or platforms. Tools such as multi cutters, steel shears, and combination shears, including the Combi-Shears HCS8, as well as core drilling and sawing equipment require non-slip, clean decks and controlled debris drop. Hose bundles and hydraulic power packs must be routed to avoid trip hazards, and edges must be fitted with edge guards.
Load and operations organization
- Mark work areas for power units; distribute point loads via stringers made of squared timber (e.g., as a ledger bridge).
- Relieve line loads (water, oil, power) with brackets on the guardrail; protect drip points with drip trays placed on planks.
- Secure offcuts and rebar pieces promptly and store them in containers to avoid deck deflection.
Support scaffolds, formwork, and shoring
As a support scaffold, wooden scaffolds temporarily shore formwork or components. In controlled deconstruction, partial areas can be shored before components are released with concrete demolition shears or deliberately weakened by splitting cylinders. Important aspects are continuous load paths, adequate anti-overturning stability, and the avoidance of eccentric load introduction due to asymmetrically split components.
Special environments: façade, tunnel, stone
At façades of historic buildings, wooden scaffolds are common due to their adaptability. They allow fine adjustments to uneven substrates and sensitive surfaces. In tunnels and rock cavities, timber platforms can serve as work platforms in confined situations for blast preparations, splitting works, or saw cuts; execution must be adapted to environmental loads, moisture, and fire risks.
Natural stone extraction and special applications
In natural stone extraction, timber work platforms can be positioned precisely to reach splitting boreholes or operate stone splitting cylinders. Advantages include low self-weight and rapid adaptability. In special applications, for example in heritage-protected areas, a timber-based scaffold solution reduces contact and anchorage points in the existing structure.
Material selection, moisture, and durability
Load-bearing softwoods are used for posts, ledgers, and decks, with strength class and moisture content matched to the planned service life and environment. Moisture variations affect dimensional stability and load behavior; components must be protected against splash water and damaged timber must be removed from service. Fasteners must be corrosion-protected and matched to the timber quality.
Occupational safety, fire protection, and environmental protection
Workplaces on wooden scaffolds require non-slip decks, side protection, and clear traffic routes. Dust and noise from demolition and cutting works must be minimized, for example through extraction and organized debris drop. Wood is combustible; therefore ignition sources must be controlled, hot works secured, and fire extinguishing media kept available. Legal requirements and company-specific regulations must be applied on a project-specific basis.
Erection, use, and dismantling
Erection is carried out in sections with immediate bracing and temporary safeguards. Before commissioning, a visual inspection with documentation is advisable; recurring inspections record settlements, moisture damage, or loose connections. Dismantling is planned to avoid residual loads, restrained components, and suspended loads, especially after the use of stone and concrete splitters, which can alter local crack patterns.
Typical error sources and practical notes
- Underestimated point loads from hydraulic power packs and component remnants; remedy: load distribution plates and stringers.
- Missing longitudinal bracing; remedy: diagonals and coupling across deck layers.
- Insufficient side protection at demolition edges; remedy: three-part guardrail and safety nets.
- Hose and cable clutter; remedy: defined hose routing, hangers on the guardrail, edge guards.
- Moisture-induced slip hazard; remedy: drainage, regular cleaning, grippy decks.
Interfaces to tools and processes
The choice of working method influences the wooden scaffold. Low-stress methods such as working with concrete demolition shears or splitting techniques reduce vibrations and the risk of loosening cracks in the scaffold. Cutting and separating tools (e.g., tank cutters for metal vessels, steel shears for reinforcement) require spark and fire protection, clear exclusion zones, and fire-resistant coverings on timber surfaces.




















