Breaker hammer

Breaker hammers are central tools in demolition, deconstruction, and structural repair of structures. They enable controlled loosening and size reduction of concrete, masonry, asphalt, and natural stone. In many projects they are combined with additional hydraulic systems to limit vibrations, cut reinforcement, or efficiently prepare massive cross-sections. In conjunction with solutions from Darda GmbH—such as rock and concrete splitters, hydraulic power packs, or concrete demolition shears—processes can be planned appropriately for the material and surroundings, without promotional intent, but with a focus on technology, methodology, and safety.

Definition: What is a breaker hammer

A breaker hammer is a hand-held percussive tool for removing and breaking mineral construction materials. It operates with high impact energy and transfers impulsive forces to an inserted chisel. Common power sources are electric (corded or battery), pneumatic (colloquially “jackhammer”), and hydraulic. In everyday language, terms such as demolition hammer or chipping hammer are also used. Typical applications include opening slab layers, removing foundations, creating openings, and asphalt breakout in civil engineering.

Types and power sources: electric, pneumatic, hydraulic

The choice of type influences performance, handling, and the application environment.

  • Electric breaker hammers: flexible indoors, available as corded and battery-powered units. Suitable for medium-hard to hard materials, depending on impact energy and chisel. Low emissions, but with dust and noise generation.
  • Pneumatic breaker hammers: high continuous output with robust design. Require a compressor and are suitable for road and civil engineering, asphalt breakout, and heavy demolition outdoors.
  • Hydraulic breaker hammers: compact with high power density. They are supplied via a hydraulic power pack. In interior demolition or sensitive areas, the hydraulic supply can be spatially separated to reduce emissions at the workstation.

In projects where vibrations must be limited or massive cross-sections are present, breaker hammers are often combined in practice with rock and concrete splitters as well as concrete demolition shears to gently loosen the material and then remove it in a targeted manner.

Application areas in concrete demolition and specialized deconstruction

Concrete demolition and specialized deconstruction

When removing foundations, floor slabs, column heads, or slab bays, the breaker hammer excels through direct tool control. In densely built areas, low vibration is important. Here, pre-loosening with rock wedge splitters can reduce the hammering effort. Reinforcement is then separated with concrete demolition shears, while residual concrete is loosened with the hammer.

Strip-out and cutting

In interior demolition, breaker hammers are used for plaster and screed removal, for door and window openings, or service chases. When load-bearing elements must be selectively removed, concrete demolition shears offer a low-vibration alternative to coarse removal. For metallic inserts, steel shears or multi cutters may be considered in addition.

Rock breakout and tunneling

In geologically demanding zones and during partial excavation, breaker hammers are used for scoring, edge work, and fine profiling. Where vibration limits are tight, the use of rock and concrete splitters reduces hammering; touch-up with the hammer is then performed locally.

Natural stone extraction

In the extraction or processing of natural stone, breaker hammers are used for shaping, edge breaking, and surface textures. For block-like release, splitting techniques with rock wedge splitters are appropriate; the hammer handles the fine contour.

Special operations

In sensitive environments—such as buildings in ongoing operation, facilities with strict emission requirements, or heritage conservation tasks—a low-vibration and low-dust approach is essential. Preparation with splitting technology and targeted secondary breaking with the breaker hammer helps minimize impacts. For metallic components, depending on material thickness, steel shears and, for hollow bodies, tank cutters may be considered in addition.

Tools and chisel types

  • Pointed chisel: for scoring, localized breaking, initiating cracks.
  • Flat and wide chisel: for shearing off and detaching layers, for edges.
  • Asphalt or spade chisel: for bituminous layers and frost-sensitive assemblies.
  • Gouge and grooving chisel: for exposing joints and making service chases.

Chisel selection depends on material, reinforcement, member thickness, and the desired fracture edge. Regular re-sharpening and timely replacement increase efficiency and reduce the required impact energy.

Work methodology: break efficiently and appropriately for the material

  1. Read the structure: identify cracks, joints, formwork seams, and reinforcement paths. Start at edges and weaknesses.
  2. Lay out a grid: divide the area into segments; release sections one after another instead of “polishing” the surface.
  3. Pre-loosen: For massive concrete, drill holes and introduce pressure with rock and concrete splitters. The breaker hammer handles the secondary breaking.
  4. Separate reinforcement: Cut exposed bars with concrete demolition shears or steel shears to avoid levering forces.
  5. Dust and water: Work wet where possible or use extraction; visibility and tool life improve.
  6. Edge control: Scribe break lines, then follow with a decreasing angle to limit spalling.

Comparison and interaction with rock and concrete splitters and concrete demolition shears

Breaker hammers act locally and are flexible. Rock and concrete splitters create controlled cracks inside the component, which can reduce vibrations and noise. Concrete demolition shears grip and crush concrete bodies, separate reinforcement, and reduce hammering. In practice, the following interaction has proven effective:

  • Massive members: pre-split, then remove with the breaker hammer.
  • Reinforcement-intensive concrete: preferably open with concrete demolition shears, separate reinforcement, then perform targeted secondary breaking.
  • Interior demolition with emission requirements: splitters and shears for coarse steps, the hammer for fitting and detail work.

Hydraulic systems can be supplied from a single source via hydraulic power packs. This facilitates switching between splitting, gripping, and secondary breaking and shortens changeover times.

Selection criteria: performance, ergonomics, and environmental conditions

  • Performance data: impact energy and blow rate determine removal performance. As member thickness increases, the need for energy or for pre-splitting rises.
  • Weight and handling: heavier units usually deliver more energy but increase strain. Carrying handles, damping, and balanced weight distribution support longer shifts.
  • Vibration: low hand-arm vibration values and break-oriented work plans protect health.
  • Noise and dust: sound-damping chisel shrouds, wetting, extraction, and enclosures are essential building blocks.
  • Energy supply: mains, battery, compressor, or hydraulic power pack—depending on accessibility, emission requirements, and operating time.
  • Environmental constraints: vibration and noise limits, operating hours, and neighbor protection must be considered early in planning.

Safety, emissions, and health protection

  • PPE: safety glasses or visor, hearing and respiratory protection, gloves, safety footwear.
  • Workplace organization: secure footing, clear escape routes, orderly material removal.
  • Dust control: favor low-dust methods; mineral dust must be minimized, e.g., via wetting.
  • Secure energy sources: route hoses and cables without kinks, check couplings, and depressurize before maintenance.
  • Component condition: consider load-bearing behavior; carry out individual steps only when structural stability remains ensured.

Legal requirements for occupational safety, emissions, and neighbor protection differ by project. They should be considered early and assessed on a project-specific basis, without replacing case-by-case advice.

Typical mistakes and how to avoid them

  • Surface “polishing” instead of segmented removal: leads to time loss and chisel overheating.
  • Wrong chisel: reduces effectiveness; match chisel choice to material and task.
  • Ignoring reinforcement: early exposure and separation with concrete demolition shears speeds up the process.
  • Working without pre-loosening on massive cross-sections: plan splitters to reduce hammering.
  • Insufficient dust and noise control: combine measures and adapt to the environment.

Practical application examples

  • Ceiling opening indoors: core drilling and splitting cylinder for weakening, then breaker hammer for edges and recesses; reinforcement separated with concrete demolition shears.
  • Asphalt breakout in utility trench work: pneumatic hammer with asphalt chisel, segmented cut, controlled edges. Monitor vibrations at adjacent structures.
  • Foundation deconstruction: hydraulic breaker hammer for edge zones, drill and split in the center, removal in manageable pieces.
  • Tunnel refurbishment: profile corrections locally with the breaker hammer; release larger blocks via splitting to minimize vibrations.

Alternative methods and complementary systems

Depending on material and target geometry, additional hydraulic tools are useful: combination shears and concrete demolition shears for reinforced concrete, multi cutters for different materials, steel shears for profiles and reinforcement, tank cutters for metallic hollow bodies. The breaker hammer then handles precise finishing, releasing residual bonds, and surface preparation.

Planning and documentation in deconstruction

Step-by-step planning with a defined sequence—splitting, gripping, cutting, secondary breaking—ensures traceable workflows. Measurements of noise and vibrations, tool selection, chisel condition, and break scheduling are documented. This builds experience for future projects and continuously improves coordination between the breaker hammer, rock and concrete splitters, concrete demolition shears, and hydraulic power packs.