Imprint &
Disclaimer
Imprint
Information according to Sec. 5 TMG
Darda GmbH
Im Tal 1
78176 Blumberg/Germany
Commercial register number: HRB 611546
District court: Amtsgericht Freiburg
Contact
Phone: + 49 7702 4391-0
Fax: + 49 7702 4391-12
E-Mail: info@darda.de
VAT number
VAT number according to Sec. 27a sales tax law:
DE811501446
Responsible for the content according
to Sec. 55 paragraph 2 RStV
Darda GmbH
Represented by
Burkhard Darda
Im Tal 1
78176 Blumberg
Photo credits
Matthias King: sptmbr
Johannes Feederle: Johannes Feederle
Keffekt Design: Keffekt Design
Icons: iconmonstr
Concept and Design
sptmbr designagentur: sptmbr
Dispute Settlement
The European Commission provides a platform for online dispute resolution (OS): https://ec.europa.eu/consumers/odr
You will find our e-mail address at the top of the imprint.
We are not willing or obliged to participate in dispute resolution proceedings before a consumer arbitration board.
Disclaimer –
Legal notice
Liability for contents
As a service provider, we are responsible for our own contents on these webpages according to Sec. 7 paragraph 1 TMG (German Telemedia Act) and general laws. According to Sec. 8 to 10 TMG, however, we as a service provider are not obliged to monitor transmitted or stored third-party information or to search for circumstances that indicate illegal activity.
Obligations to remove or block the use of information according to the general laws remain unaffected. However, liability in this regard is only possible from the time of knowledge of a concrete violation of the law. If we become aware of corresponding infringements, we will remove these contents immediately.
Liability for links
Our offering contains links to external websites of third parties, over whose contents we have no influence. Therefore, we cannot assume any liability for these external contents. The respective provider or operator of the webpages is always responsible for the contents of the linked webpages. The linked webpages were checked for possible legal violations at the time of linking. Illegal contents were not recognizable at the time of linking.
However, a permanent control of the contents of the linked webpages is not reasonable without concrete evidence of a violation of law. If we become aware of any infringements, we will remove such links immediately.
Copyright
The contents and works on these webpages created by the website operators are subject to German copyright law. The reproduction, editing, distribution and any kind of use outside the limits of copyright law require the written consent of the respective author or creator. Downloads and copies of these webpages are only permitted for private, non-commercial use.
Insofar as the content on this website was not created by the operator, the copyrights of third parties are respected. In particular, third-party content is identified as such. Should you nevertheless become aware of a copyright infringement, please inform us accordingly. If we become aware of any infringements, we will remove such contents immediately.




















