Groundwater contamination

Groundwater is a central resource for drinking water, agriculture, and industry. On construction sites for concrete demolition, special demolition, rock excavation, and tunnel construction, however, material flow may unintentionally enter the subsoil. Choosing demolition methods, processes, and equipment with a focus on groundwater protection and planning execution carefully significantly reduces risks. In particular, methods such as hydraulic splitting with hydraulic rock and concrete splitters or selective removal with concrete demolition shears often allow low-dust, low-vibration levels, and water-minimizing workflows that reduce inputs into the ground.

Definition: What is meant by groundwater contamination

Groundwater contamination refers to the unwanted alteration of groundwater quality by physical, chemical, or biological influences. These include, for example, fine particle inputs (turbidity), elevated pH values due to concrete slurry, salts (chlorides, sulfates), metals (e.g., chromium, zinc), organic hydrocarbons (oils, fuels), as well as nutrients. In the context of demolition and rock works, such influences arise in particular from construction site wastewater, slurries, dust deposits, leaks of hydraulic fluid, and the leaching of exposed materials. The aim of planning, equipment selection, and execution is to prevent such inputs or control them in such a way that impairment of the natural groundwater balance is avoided.

Causes and pathways on deconstruction and rock sites

Many potential pathways into the subsoil exist on construction sites. Decisive factors are subsoil conditions (permeability), the distance to the groundwater level, the weather (precipitation), and the chosen methods. Typical causes include:

  • Alkaline concrete slurry from wet cutting or wet drilling methods (often pH > 11) with a high fine-particle load.
  • Fine dust and cement paste from crushing concrete, for example when using concrete demolition shears if no retention is provided.
  • Hydraulic oils and operating supplies from a hydraulic power pack or a hydraulic hose line due to leaky connections.
  • Leaching from construction debris stockpiles when crushed material lies unprotected in the rain.
  • Drill cuttings, rock flour, and blasting residues in rock, especially in water-bearing fractures.
  • Residual contents from tanks when dismantling with a cutting torch if media have not been completely removed.

In addition to the source itself, the transport route is decisive: Infiltration over unpaved areas, percolation through temporary ditches, or entry via fissures and fractures in rock. Forward-looking construction logistics interrupt these routes.

Effects of methods: How technology influences groundwater quality

The choice of demolition method directly affects the type and quantity of potential inputs. Methods with low water and slurry production and controlled fragmentation are advantageous.

Concrete demolition shears: selective, low-water, controllable

Concrete demolition shears separate and crush concrete close to the structural element and generally do not generate process water. This reduces the risk of alkaline slurries. At the same time, fines are produced that can be mobilized during rainfall. Protective measures therefore include retaining fines, working on an impermeable base, and orderly material removal. In sensitive areas, staged removal with intermediate cleaning is advisable to avoid accumulating fines.

Hydraulic splitters: hydraulic splitting instead of wet cutting

Hydraulic splitting separates concrete or rock through controlled expansion without a water jet and without abrasive suspensions. Slurries are thus largely avoided; vibrations and shocks remain low. In rock, however, splitting can open fractures. Near water-bearing horizons, sealing measures (e.g., local sealing, temporary drainage with filtration) and close monitoring are advisable.

Combination shears, attachment shears, and steel shears

Cutting tools such as hydraulic shear, attachment shear, and steel shear do not generate process water and are favorable for groundwater protection provided hydraulic systems are tight. Sharp, precise cutting avoids additional crushing steps and thereby fine dust. It remains important to proactively remove media from pipes and hollow sections to prevent drip losses.

Cutting torch: media-free condition takes priority

When dismantling tanks with a cutting torch, complete emptying and inerting beforehand take priority. Residual liquids, slurries, or vapors must be consistently removed and properly disposed of so that no substances can escape and percolate.

Hydraulic power packs: tightness and emergency preparedness

Hydraulic power packs supply energy to shears and splitters. Using leak-free hydraulic power units supports groundwater protection; hose protection, drip trays, and regular maintenance are core measures. Refueling takes place on sealed surfaces. Even small drips can enter the subsoil on unpaved ground—good housekeeping prevents this.

Applications and typical risks

Concrete demolition and special demolition

In selective deconstruction, structural elements are removed in a targeted way. Concrete demolition shears and hydraulic splitters enable water-minimizing workflows. Risks arise from the release of fines, wash water, and the leaching of fresh fracture surfaces. Covering, material separation, and dry cleaning procedures protect groundwater.

Gutting works and cutting

For cutting openings and separating reinforcement, the use of dry methods (shear) is usually more favorable for groundwater than wet cuts. If wet methods are required, slurries must be treated by sedimentation, filtration, and pH adjustment before disposal.

Rock excavation and tunnel construction

In rock, drill cuttings, rock flour, and possible contact waters to fracture systems dominate. Hydraulic splitting and controlled removal reduce explosives residues. Targeted water management (temporary drainage with filter sections) and retaining drill cuttings prevent inputs. Monitoring points (piezometers) help detect changes.

Natural stone extraction

In extraction operations, minimizing fines and orderly water management are paramount. Dry separation techniques, rock wedge splitter, and shear tools reduce process water. Material stockpiles are set up so that percolating water does not run off unfiltered.

Special operations

In sensitive locations, such as water protection areas or confined inner-city sites, low-emission, precise methods have priority. Short work cycles, closed material cycles, and mobile retention systems are crucial to prevent inputs.

Prevention and protective measures on site

Groundwater protection begins before the first work step. The following measures have proven effective:

  • Planning and baseline: Prior sampling/baseline survey of soil and, if applicable, groundwater; definition of protection and emergency measures.
  • Containment: Set up work areas on an impermeable base (film, steel plate, asphalt); edges with upstands.
  • Retention of fines: Sediment trays, fleece or cartridge filters; maintain regularly and dispose of correctly.
  • Prefer low-water methods: Where structurally and technically feasible, use dry separation methods such as concrete demolition shears or hydraulic splitters.
  • Slurry and wastewater treatment: Sedimentation, filtration, pH neutralization prior to disposal; never allow uncontrolled percolation.
  • Hydraulics and fuel management: Tight connections, hose protection, drip trays, refueling on sealed surfaces, emergency kits (absorbents).
  • Material and waste logistics: Separate storage; cover before rainfall; prompt removal of fine fractions.
  • Consider weather: Do not perform work with increased emission potential before heavy rain; temporarily reroute and filter runoff.
  • Site rules: Clean equipment, regular sweeping, no rinsing on unpaved areas.

Measurement, monitoring, and documentation

Monitoring makes measures verifiable and provides assurance. Simple field measurements and—depending on the project—specialist investigations are suitable.

  • Field parameters: pH, conductivity, turbidity, temperature in discharge or percolating waters.
  • Control points: Provisional seepage-water collection points; piezometers if needed.
  • Documentation: Measurement logs, photo documentation, evidence of proper disposal of slurries and filters.
  • Thresholds and response: If anomalies occur, stop work, find the cause, and tighten measures.

Planning: Selecting technology with groundwater protection in mind

  1. Analyze structural element and surroundings: Material, reinforcement, load-bearing behavior, distance to groundwater, soil build-up, protected assets.
  2. Weigh methods: Prefer dry, precise techniques (concrete demolition shears, hydraulic splitters, hydraulic shear, steel shear); use wet methods only if technically required.
  3. Plan the retention chain: Sealed surfaces, sedimentation stages, filtration, pH management, disposal route.
  4. Secure hydraulics and power supply: Check tightness, set up containment systems, define emergency management.
  5. Stagger the workflow: Work in stages; regularly remove fines; carry out cleaning dry.
  6. Anchor control: Define monitoring points and test intervals; clarify responsibilities.

Common mistakes and how to avoid them

  • Mistake: Wet cutting without slurry treatment. Prevention: Retention, filtration, neutralization; consider alternative methods.
  • Mistake: Refueling on unpaved ground. Prevention: Use sealed surface and drip tray.
  • Mistake: Uncovered fine fractions before rain. Prevention: Cover and prompt removal.
  • Mistake: No emergency equipment. Prevention: Keep absorbents, sealing cushions, and an emergency plan on hand.
  • Mistake: Unverified media in tanks before using a cutting torch. Prevention: Complete emptying and gas-free clearance.

Material and waste management with groundwater in mind

A well-thought-out material flow management prevents inputs: structural elements are separated selectively, fines are collected separately, and filter residues and slurries are properly disposed of. Mineral construction debris is temporarily stored—if planned—only after sufficient dewatering and without a risk of leaching. For metallic components (e.g., reinforcement), steel shears and attachment shear minimize additional processing steps, eliminating potential process water.

Legal notes (general, non-binding)

The handling of water-hazardous substances, construction site wastewater, and slurries is generally subject to water law requirements. Common requirements concern retention, treatment, and disposal as well as the operation of installations (e.g., sealed surfaces, leakage protection). Depending on the location, additional conditions apply, for example in protection areas. It is advisable to clarify the applicable requirements before starting and to document the protection measures taken. These notes are general in nature and do not constitute legal advice.