Concrete separation/cutting describes the controlled loosening, dividing, or removal of concrete components in buildings and infrastructure. It is used wherever structural members are to be selectively removed, components adapted, or structures completely deconstructed – from concrete demolition and special demolition to building gutting and cutting, through to rock demolition and tunnel construction as well as tasks in natural stone extraction and in special demolition. Central requirements are a predictable separation pattern, minimal vibrations, and the protection of adjacent parts of the structure. Tools such as concrete pulverizers or stone and concrete splitters from Darda GmbH enable a precise, low-emission, and material-sensitive approach in many scenarios.
Definition: What is meant by concrete separation/cutting
Concrete separation/cutting encompasses all methods by which concrete components are mechanically or hydraulically separated, reduced in size, or detached from their surroundings. The goal is a controlled removal with a defined cut or fracture edge, matched to member thickness, reinforcement ratio, concrete quality, and the requirements for environmental protection, reuse, and occupational safety. Concrete separation/cutting includes, among other things, splitting technology, size reduction with shears, cutting and sawing operations, as well as supplementary methods for separating metallic inserts. It is a core task in selective deconstruction, refurbishment works, and in the creation of openings, breakthroughs, and adaptations.
Basic principles and objectives of concrete separation/cutting
The focus is on safe load transfer, control of the crack or cut path, and the reduction of noise, dust, and vibrations. Methods are chosen according to member geometry, environmental sensitivity, material properties, and available energy sources. Hydraulically powered tools such as concrete pulverizers as well as stone and concrete splitters from Darda GmbH allow targeted separation without introducing percussive impact energy into the structure. The results are reproducible separation patterns, low impact on the structural stability of adjacent members, good preconditions for source-separated material streams, and efficient haulage of the segments.
Methods and tools for concrete separation/cutting
Depending on the task, methods are used individually or in combination. Selection is based on target geometry, concrete strength, reinforcement content, accessibility, and environmental requirements.
- Hydraulic splitting technique: Stone and concrete splitters as well as rock splitting cylinders create controlled crack patterns along predrilled axes. Particularly suitable for massive members, foundations, or rock where low vibrations are required.
- Shear and cutter technique: Concrete pulverizers crush concrete and expose reinforcement; combination shears and multi cutters additionally enable cutting of steel sections or embedded parts. Steel shears serve the targeted cutting of reinforcing steel.
- Cutting and sawing methods: Wall saws, wire saws, and core drilling deliver precise cut edges and openings; they are often combined with pulverizers or splitting to subsequently release or downsize members.
- Special solutions: Tank cutters and similar tools are needed for special demolition tasks, for example with combined assemblies of concrete and metal, in sensitive industrial settings, or in confined spaces.
Typical application areas
Concrete separation/cutting is carried out in diverse project contexts. The following scenarios illustrate requirements and suitable tool families:
- Concrete demolition and special demolition: Selective detachment of massive components, dismantling of foundations and load-bearing elements. Concrete pulverizers and stone and concrete splitters operate with low vibrations and enable step-by-step removal.
- Building gutting and cutting: Creation of openings, breakthroughs, and adaptations in existing structures. A combination of cutting/sawing followed by downsizing with concrete pulverizers has proven itself in interior work.
- Rock excavation and tunnel construction: Splitting technique with rock splitting cylinders for controlled opening of rock and shotcrete where low vibrations and precise crack guidance are required.
- Natural stone extraction: Use of splitters for defined fracture edges and high surface quality without thermal influence.
- Special demolition: Deconstruction in sensitive areas, for example near existing utilities, plants, or in ATEX zones, where low-emission, controlled methods are required.
Hydraulic splitting technique: stone and concrete splitters in focus
Splitting exploits the fact that concrete and natural stone have high compressive strength but lower tensile and splitting tensile strength. Hydraulic rock and concrete splitters or rock splitting cylinders are inserted into predrilled holes. Hydraulically extending wedges generate a defined splitting pressure that initiates cracks along the borehole axes and thus separates members in a controlled manner. Advantages are low vibrations, little noise, and a predictable fracture pattern – ideal for massive members, tight spaces, and sensitive surroundings.
Borehole planning and splitting pattern
The separation result depends significantly on borehole diameter, hole spacing, drilling depth, edge distances, and the concrete structure (matrix). Careful borehole planning steers crack propagation and prevents unwanted spalling. With high reinforcement density, tighter grids and coordinated splitting sequences are necessary; where appropriate, pulverizers or saws are used before or after to expose reinforcement or to release remaining cross-sections in a controlled way.
- Member analysis: thickness, reinforcement, concrete quality, boundary conditions.
- Drilling plan: diameter, grid, edge distances, splitting direction.
- Splitting sequence: step-by-step activation, observation of the crack pattern.
- Follow-up: downsizing of segments with concrete pulverizers, cutting the reinforcement.
Concrete pulverizers for selective deconstruction
Concrete pulverizers act via high, locally introduced compressive forces and lever action. They crush concrete, initiate cracks, and expose the reinforcement. This enables sectional removal of slab fields, walls, column heads, and foundations. Indoors or in sensitive environments, hydraulic operation – in combination with suitable hydraulic power packs – allows work with reduced noise and without impact energy.
Handling reinforcement and embedded parts
After opening the concrete, exposed reinforcing steel is cut with steel shears; combination shears and multi cutters cover different cutting tasks depending on cross-section and material grade. In the presence of prestressing, special precautions are required; cutting tendons demands structural analysis and coordinated safeguarding measures.
Hydraulic power packs: energy source and control
Hydraulic power packs supply concrete pulverizers, stone and concrete splitters, and other tools with pressure and flow. Key parameters are operating pressure, delivery capacity, temperature control, and mobility. For indoor work, electrically driven power units are frequently used. Selection is oriented to tool demand, operating time, transport paths, and the requirements for emissions and occupational safety.
Planning and execution: step by step
- Preliminary investigation: as-built documents, site visit, detection of utilities, embedded parts, and access conditions.
- Member diagnostics: material samples, rebar locating, measurement of member thickness and strength, assessment of cracks, voids, and moisture.
- Method selection: matching target geometry, emission limits, and boundary conditions with splitting, pulverizer work, cutting/sawing, or combinations.
- Separation and load transfer concept: cutting and splitting sequences, interim shoring, lifting and securing points, protection of adjacent members.
- Trial cut/test field: validation of parameters, fine-tuning of drilling grid, splitting pressure, pulverizer positions.
- Protective measures: dust suppression, noise reduction measures, catch and containment systems, fire protection, barricading.
- Execution: documented work sequence, continuous control of the separation pattern, member deformations, and emission values.
- Post-processing: lowering and downsizing of segments, source-separated separation of concrete and steel, haulage logistics.
- Disposal and recycling: processing of concrete debris, routing the reinforcing steel into the metal cycle, documentation in accordance with applicable requirements.
Safety, environment, and permitting
Work on load-bearing members requires a coordinated safety concept. This includes structural considerations, safeguards against falls and uncontrolled movements, and measures to reduce emissions. Dust is reduced by extraction and wetting, noise and vibrations are monitored and adapted to local requirements. Permits and notice procedures must be reviewed project-specifically; binding statements arise only from the competent authorities and the responsible planners. Where applicable, a deconstruction permit/approval or demolition notice may be required.
Quality characteristics and key figures
For the assessment of concrete separation/cutting, reproducible separation patterns, low edge damage, predictable daily outputs, and an appropriate ratio of energy input to removal quantity are decisive. Important influencing factors are concrete compressive strength class, reinforcement ratio, accessibility, and the coordination between tool and hydraulic power pack. Continuous monitoring of process values improves result quality and scheduling.
Avoiding common failure patterns
- Uncontrolled crack formation due to an unsuitable drilling grid: carry out preliminary trials and adjust the geometry.
- Blocked splitting cylinders due to drill binding: borehole cleaning, sufficient flushing, and proper diameter are essential.
- Overloading concrete pulverizers at heavily reinforced nodes: split the work steps, expose reinforcement in advance, and cut separately.
- Insufficient power unit performance: match tool and hydraulic parameters; observe temperature management.
- Disregarding prestressing: perform separation only with appropriate safeguards and design approval.
Materials science and structural condition
Concrete mix design, aging, moisture, and possible damage influence the separation strategy. High-strength concretes require tighter drilling and splitting grids or a combination with sawing operations. Fibre-reinforced concrete and high reinforcement ratios favor combined use of concrete pulverizers, multi cutters, and steel shears. In carbonated or frost-damaged zones, crack behavior can be irregular; here, a finer sequencing of work steps improves control.
Particularities in rock excavation and tunnel construction
In confined, sensitive environments with low-vibration requirements, splitting shows its strengths. Stone and concrete splitters can be closely guided, are modularly adaptable, and create defined fracture surfaces. This protects the surroundings, facilitates sectional removal, and reduces the effort for securing works at the tunnel face or the existing structure.
Maintenance and care of the tools
The service life and precision of concrete pulverizers, stone and concrete splitters, and supplementary tools depend on proper maintenance. This includes regular visual inspections, functional checks, lubrication, and timely replacement of wear parts. Hydraulic systems must be checked for tightness, pressure retention, and oil quality; hoses and couplings must be reliably locked and routed with protection.
Resource conservation and recycling
Controlled concrete separation/cutting facilitates source-separated separation of concrete and steel. This simplifies transport, processing, and reuse. Tools such as concrete pulverizers generate manageable segments; splitting creates fracture surfaces where they are most useful for subsequent material flow. In this way, the method supports circular construction with a focus on reuse and reduced environmental impacts.
Special deployments and combined assemblies
In industrial plants, on inner-city construction sites, or with complex assemblies of concrete and metal, compact, precisely controllable tools are required. Tank cutters, steel shears, and multi cutters complement concrete separation/cutting when embeds, claddings, or lines must be safely exposed and dismantled. The sequence – opening the concrete, exposing the reinforcement, cutting metallic parts – is defined and documented for each project.




















