COMBI-SHEARS

CUTTING, BREAKING AND EXPANDING WITH ONE UNIT

    • Hydraulic Combi - Shears
    • Accurately breaks concrete and massonry
    • Separates a wide range of materials
    • Cuts metal, cables, Wood, metal sections, iron rods, etc.
    • Capeable of many demolition Jobs inside buildings
    • Performs virtually free of vibration
    • Nearly dust and noise free
    • Light and easy to handle
    • Quick and productive

The Combi - Shears are equipped with updated shears and jaw sets and are especially designed for inside demolition jobs.

 

The Combi - Shears are available in four different versions based on a modular system - one main body with four interchangeable tools.

 

A complete Combi - Shears unit consists of one or more Combi- Shears, high and low pressure hoses and also a hydraulic power unit.

 

The Combi - Shears are an optimal complement to the Darda Splitters. They can both be connected to a Darda hydraulic power unit.