CONCRETE CRUSHERS

GREATEST CRUSHING POWER WITH MINIMAL WEIGHT

    • Light but nevertheless strong
    • Extremely efficient with small load-bearing devices
    • Extremely large aperture for demolition of thick pieces of concrete
    • Ideal for use in building interior
    • Replaceable crushing tips and cutting heads
    • Performance independent of the load-bearing device
    • 360° rotation

High-quality materials and the special pressure-intensifier system bring a high crushing power to the Darda concrete crushers with smallest dead weight. They are therefore suitable for small load-bearing devices, where heavier traditional crushers would not work. Thanks to their large opening they can break-up very thick concrete pieces, which other crushers cannot master.