
COMBI-SHEARS HCS8 S
WITH SICKLE BLADE - CUTTING MATERIALS SAFETY
-
Cutting
-
Eqipped with the Sickle blade set the HCS8 S can cut:
- Metal pipes
- Water lines
- Metal framing
- Cut high-power cables
- Wood pieces
- Sheet metal
- Pipes and round material up to Ø16 mm
The sickle shape blades insure that the material can't ship out.
Order No. | HCS8 |
Combi-Shear HCS8 S | 9014 0335 80 |
Universal shear set C | 6500 0720 82 |
Sickle blade set S | 6500 0726 82 |
Concrete jaw set J | 6500 0723 82 |
Brick jaw set B | 6500 0722 82 |
Hydraulic hose | Number of Combi-Shears | 10 m |
S1 | 1 | 8381 0504 02 |