PRODUCT OVERVIEW

SPLITTERS

Type C2S C4E C4E C9 C9 C12 C12 C12
Wedge set N N WL N L N L W
Weight (kg) 18 22 23 22 23 31 32 31
Splitting force theoretical (t) 355 461 333 305 305 618 824 494
Splitting force effective (t) 195 230 190 200 200 358 413 321
Drill hole diameter (mm) 32 34 - 36 35 - 38 45 - 48 48 - 50 45 - 48 45 - 48 45 - 48
Drill hole depth (mm) 270 430 540 410 580 610 680 550
Length wedge set (mm) 140 250 400 230 400 380 450 340
Splitting distancce 9 10 - 40 14 18 - 44 18 - 40 20 - 50 15 - 35 24 - 56
Options
Hydraulic hoses +++ +++ +++ +++ +++ +++ +++ +++
Manifolds +++ +++ +++ +++ +++ +++ +++ +++
Enlarging counter wedges - +++ - +++ +++ +++ +++ +++
Special enlarging counter wedges - - - +++ +++ +++ +++ +++
Pressure shells - - - +++ - - +++ +++

+++ available, - not available

 

 

Primary Application Areas

C2S C4E C9 C12
Demolition of Concrete and Steel Reinforced Concrete
Demolition of normal and lightly reinforced concrete O O
Demolition of steel reinforced concrete o O
Demolition in enclosed rooms
and in hard to access places
O O
Demolition in tight places O o
Stone and concrete wall demolition O O
Heads from concrete piles O O
Chimney work O o
Secondary cutting large concrete blocks
(e.g. smaller break-up for recycling purposes)
O o
Underwater demolition O O
Rock Demolition
Rock demolition (e.g. with trench work) o O
Secondary cutting of rock o O O O
Tunnel work O O o
Extension work in underground mining O O O O
Mining work o O o o
Presspipe work O O O
Block Production in the Natural Stone Industry
Marble O
Granite o O O
Sandstone O
  • O = cylinder is most suitable

  • o = cylinder is suitable