Merchandise
Take a look at our merchandise products and order directly to be perfectly equipped for customer visits and exhibitions.
Only for our dealers!
*All prices are net (without taxes).
T-Shirt
- T-Shirt・black・Darda Designlogo
- Material: 100% cotton (Sports Grey: 85% cotton, 15% viscose)
- Grammage: 180 g/m²
–
+
Hoodie
- Hoodie・black・Darda Designlogo
- Material: 80% cotton, 20% polyester (grey melange: 90% cotton, 10% viscose)
- Grammage: 320 g/m²
–
+
Polo-Shirt
- Polo-Shirt・black・Darda Logo
- Material: 100% cotton
- Grammage: 190 g/m²
–
+
Truckercap
- Truckercap・black/white・Darda Designlogo
- Material: 47% cotton, 28% nylon, 25% polyester
–
+
Price: 11.90 €
Basecap
- Basecap・black・Darda Logo
- Material: 100% polyester
–
+
Price: 7.50 €
Beanie (Designlogo)
- Beanie・black・Darda Designlogo
- Material: 63% polyester, 32% cotton, 5% elastane
- Grammage: 170 g/m²
–
+
Price: 8.90 €
Beanie (Weblable)
- Beanie・black・Darda Weblable
- Material: 63% polyester, 32% cotton, 5% elastane
- Grammage: 170 g/m²
–
+
Price: 7.40 €
Beanie (Knitted)
- Knitted Beanie・black・Darda Logo
- Double layer
- Material: 100% polyacrylic
–
+
Price: 8.90 €
Tube Scarf
- Tube Scarf・black・Darda Logo
- Material: Polyester
- Grammage: 145 g/m²
–
+
Price: 2.90 €
Backpack
- Backpack・blue・Darda Logo
- Versatile backpack with a functional design
- Size: 25 Litre
–
+
Price: 49.00 €
Cotton Bag
- Cotton Bag・black・Darda Logo
- Illustration: Outline Concrete Crusher
- Size: 38 x 42 cm
–
+
Price: 2.40 €
Cotton Backpack
- Cotton Backpack・black・Darda Logo
- Material: cotton
- Grammage: 140 g/m²
- Size: 37 x 46 cm
–
+
Price: 5.80 €
Bottle
- Bottle・black・Darda Logo
- Size: 0,5 Litre
- The insulated 18/8 stainless steel keeps drinks hot or cold for several hours
–
+
Price: 12.70 €
Keytool
- Keytool・silver・Darda Logo
- Multifunctional tool is equipped with 21 useful functions
–
+
Price: 8.70 €
Lanyard
- Lanyard・black・Darda Logo
- Material: Polyester
- Size width: 20 mm
- With safety lock
–
+
Price: 1.90 €
Folding Rule
- Folding Rule・cyan ・Darda Logo
- Size: 2 Metre
–
+
Price: 4.80 €
Ballpoint Pen
- Ballpoint Pen・black/blue・Darda Logo
- Writing colour: blue
–
+
Price: 0.80 €
Pencil
- Pencil・white・Darda Logo
- oval, 240 mm, sharpened, medium-hard lead
–
+
Price: 0.60 €
Writing Pad (A5)
- Writing Pad・white・Darda Logo & adress
- DIN A5 (148 x 210 mm), 50 sheets, 90 g/m², chequered
–
+
Price: 1.20 €
Writing Pad (A4)
- Writing Pad・white・Darda Logo & adress
- DIN A4 (210 x 297 mm), 50 sheets, 90 g/m², chequered
–
+
Price: 2.30 €





















