{"id":20230,"date":"2026-02-02T11:47:46","date_gmt":"2026-02-02T10:47:46","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20230"},"modified":"2026-06-22T17:00:04","modified_gmt":"2026-06-22T15:00:04","slug":"rebar-lap-splice","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice","title":{"rendered":"Rebar lap splice"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The rebar lap splice is a central detail of reinforced concrete construction and plays a decisive role in both new construction and deconstruction. In existing structures, it influences the load-carrying behavior and thus the sequence and method of controlled demolition. Anyone who selectively cuts, mills, crushes, or splits concrete members must know where lap splices are located and how they affect the bond between concrete and steel. This is especially true for work with <strong>concrete pulverizer<\/strong> as well as with <strong>hydraulic splitter<\/strong>, as used in concrete demolition and special demolition, in gutting works, or in tunnel construction. Sound knowledge of rebar lap splice enables predictable cutting paths, stable load transfer during deconstruction, and a high level of safety on the construction site. In addition, a transparent strategy for handling splice zones supports method statements, risk assessments, and coordinated sequencing during structural alteration.<\/p>\n<h2>Definition: What Is Meant by Rebar Lap Splice?<\/h2>\n<p>Rebar lap splice means the jointing of two reinforcing bars by a defined overlap. This connection &#8211; also called <em>lap splice<\/em>, <em>longitudinal splice<\/em>, or <em>rebar splice<\/em> &#8211; transfers tensile forces and, to some extent, compressive forces via the bond between deformed reinforcing steel and the surrounding concrete. The lap length is dimensioned so that the forces from one bar are safely introduced into the other through bond, mechanical interlock, and friction. Typically, the bars run in parallel, are placed side by side over a specified <strong>lap length<\/strong>, and are fixed with suitable means (e.g., tie wire or spacers) before the concrete is placed. In addition to classic lap splices, alternative splice types such as welded joints or mechanical couplers exist; in deconstruction, these variants behave differently and should be identified.<\/p>\n<ul>\n<li><strong>Purpose<\/strong>: transfer of tension and, where applicable, compression over a defined overlap.<\/li>\n<li><strong>Load transfer mechanisms<\/strong>: adhesion, friction, and mechanical interlock along the ribbed profile.<\/li>\n<li><strong>Arrangement<\/strong>: parallel bars with maintained spacing, secured against displacement before concreting.<\/li>\n<li><strong>Variants<\/strong>: welded and mechanical couplers require separate assessment in demolition due to distinct failure modes.<\/li>\n<\/ul>\n<h2>Design and Influencing Factors of Lap Length<\/h2>\n<p>The required lap length depends primarily on the diameter and grade of the reinforcing steel, the concrete strength, cracking, concrete cover, the location within the member (tension or compression zone), the arrangement of stirrups\/shear reinforcement, and the bond conditions. The larger the bar diameter and the less favorable the bond (e.g., cracked tension zone, low cover, smooth bars), the longer the lap. In practice, the length is often several bar diameters. Standards and national annexes govern the exact design; they must be applied project-specifically. For deconstruction, this means: splice zones can have considerable length and transfer forces over an extended region. If the bond there is impaired by cutting, crushing, or splitting, the local stress states change &#8211; with direct effects on fracture patterns, crack propagation, and residual load-bearing capacity during the operation.<\/p>\n<ul>\n<li><strong>Key parameters<\/strong>: bar diameter and grade, concrete class, bond quality (cracked vs. uncracked), cover and confinement by transverse reinforcement.<\/li>\n<li><strong>Detailing effects<\/strong>: hooks, bends, laps in staggered arrangement, and bar coating condition (e.g., corrosion) modify required lap length.<\/li>\n<li><strong>Member location<\/strong>: laps in tension zones are more sensitive to bond disturbance than in compression zones.<\/li>\n<li><strong>Execution tolerances<\/strong>: misalignment, insufficient consolidation, or honeycombing can locally reduce bond and should be anticipated in demolition planning.<\/li>\n<\/ul>\n<h2>Relevance in Concrete Demolition and Special Demolition<\/h2>\n<p>Lap splices are not mere detailing; they are load-bearing elements. When opening slabs, creating wall openings, or deconstructing beams, their location determines safe execution. Work with <strong>concrete pulverizer<\/strong> enables controlled removal of the concrete cover to expose splice zones. <strong>Hydraulic splitter<\/strong> generates targeted crack patterns; in splice regions these may deviate from expectations because the reinforcement redirects forces or steers the crack path. Correctly assessing the overlaps allows you to plan cutting and splitting sequences so that overlapping bars are not disabled simultaneously but residual capacity is reduced step by step.<\/p>\n<ul>\n<li><strong>Practical implication<\/strong>: maintain staggered residual load paths by avoiding simultaneous severing of lapped bars.<\/li>\n<li><strong>Access strategy<\/strong>: selective exposure of cover first, followed by staged splitting or cutting aligned with force flow.<\/li>\n<li><strong>Risk management<\/strong>: adapt sequence when splice zones extend further than assumed or confinement is weaker than expected.<\/li>\n<\/ul>\n<h3>Typical Locations of Lap Splices<\/h3>\n<p>In slabs and floor plates, lap splices are often located in regions of lower bending moments or in connection fields. In beams they are frequently placed in zones with reduced moment or near supports, although historical construction practices may differ. In walls, splices occur along the joints of longitudinal reinforcement; in columns, especially at story joints and extension zones. In existing structures, retrofits, strengthening measures, or repairs can create additional splice zones that are not shown on the original drawings.<\/p>\n<ul>\n<li><strong>Cast-in-place vs. precast<\/strong>: precast joints and continuity connections often concentrate laps near seams, corbels, or wet joints.<\/li>\n<li><strong>Historic work<\/strong>: earlier practice may place laps in high-moment regions; verification on site is essential.<\/li>\n<\/ul>\n<h3>Effects on Cutting and Splitting Processes<\/h3>\n<p>Splice regions have a high density of reinforcement. This leads to altered spalling patterns during crushing, crack deflection during splitting, and increased rebound of the concrete. When exposing with <strong>concrete pulverizer<\/strong>, the concrete cover can be removed in a controlled manner to make the bar positions and the lap length visible. Concrete-only operations with <strong>hydraulic splitter<\/strong> are generally more predictable outside the splice zone, because the bond is more homogeneous there. For subsequently cutting the reinforcement, depending on accessibility and cross-section, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">high-performance steel shears<\/a>, combination shear, or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">multi cutters<\/a> are suitable; the power supply is provided by <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a>. The goal is to process lap splices so that force transfer is not lost abruptly at multiple locations.<\/p>\n<ul>\n<li><strong>Tool selection<\/strong>: prioritize cutting tools that fully capture bar cross-sections and allow staggered cuts with minimal vibration.<\/li>\n<li><strong>Crack control<\/strong>: align splitter wedges parallel to reinforcement when longitudinal splitting is unavoidable to guide crack paths.<\/li>\n<li><strong>Operator safety<\/strong>: anticipate sudden release in tension zones and secure work areas against rebound and falling fragments.<\/li>\n<\/ul>\n<h2>Identifying and Exposing Rebar Lap Splices<\/h2>\n<p>Ideally, the identification of lap splices is multi-stage: review drawings, classify the construction year and typical detailing, define member regions with a high probability of splices, and selectively open these areas. Visual indicators include parallel-running bars with a constant spacing over a longer distance, densified stirrup arrangements, or wire ties that grasp multiple longitudinal bars at once. Careful removal of cover with <strong>concrete pulverizer<\/strong> allows safe exposure without uncontrolled cracking. Where members are massive, preliminary splitting of the concrete can reduce stresses and improve access.<\/p>\n<ul>\n<li><strong>Non-destructive methods<\/strong>: cover meters, magnetic or radar-based rebar scanners, and ground-penetrating radar help localize bar runs and probable lap extents.<\/li>\n<li><strong>Complementary checks<\/strong>: small test openings verify bar diameters, rib patterns, and bar spacing before larger interventions.<\/li>\n<li><strong>Documentation<\/strong>: georeferenced photos and measured lap lengths support subsequent planning and approvals.<\/li>\n<\/ul>\n<h2>Procedures for Safe Separation at Lap Splices<\/h2>\n<p>A proven sequence is step-by-step and load-path-oriented: first, temporarily secure the member and clarify supports and boundary conditions. Then expose the splice zone and estimate the lap length. Arrange separation cuts or split lines preferably outside the splice region so that bond transfer is maintained while adjacent concrete areas are fragmented. When cutting the reinforcement, do not sever both bars of a lap at the same location simultaneously; instead, stagger the cuts to reroute residual forces. Extra caution is required in tension zones, as the sudden release of the lap can trigger jerky movements. Hydraulically operated cutting tools are positioned to fully capture the cross-sections without unintentionally damaging the remaining reinforcement. Controlled material removal with <strong>concrete pulverizer<\/strong> and targeted initiation of cracks with <strong>hydraulic splitter<\/strong> complement each other here.<\/p>\n<ol>\n<li><strong>Stabilize<\/strong>: secure the member and define shoring and boundaries.<\/li>\n<li><strong>Expose<\/strong>: uncover the splice zone, verify bar diameters, spacing, and approximate lap length.<\/li>\n<li><strong>Pre-fragment<\/strong>: split concrete outside the lap to maintain bond while reducing restraint.<\/li>\n<li><strong>Cut in stages<\/strong>: offset cuts in lapped bars to preserve temporary load paths.<\/li>\n<li><strong>Monitor<\/strong>: check deflection and crack behavior between steps; adapt the sequence if redistribution is unfavorable.<\/li>\n<\/ol>\n<h2>Material and Bond Behavior in the Splice Area<\/h2>\n<p>The bond between concrete and deformed steel is based on adhesion, friction, and mechanical interlock. In lap splice zones these mechanisms are mobilized over greater lengths. During deconstruction, local bond overloads cause spalling along the bars (longitudinal splitting), especially with low concrete cover or corroded reinforcement. This explains why splitting tools near splice regions may preferentially act along the reinforcement. A controlled approach with appropriate pressure stages, successive widening of split joints, and careful shortening of exposed bars with shears reduces unpredictable fracture patterns.<\/p>\n<ul>\n<li><strong>Risk amplifiers<\/strong>: inadequate cover, corrosion-induced expansion, and insufficient transverse reinforcement increase the likelihood of longitudinal splitting.<\/li>\n<li><strong>Concrete quality<\/strong>: weak or poorly compacted zones concentrate slip; adapt forces and tool positioning accordingly.<\/li>\n<li><strong>Temperature and moisture<\/strong>: wet or cold interfaces can alter friction and adhesion, affecting crack paths during splitting.<\/li>\n<\/ul>\n<h2>Specifics in Tunnel Construction, Gutting, and Special Operations<\/h2>\n<p>In tunnel construction, lap splices occur in shotcrete linings, inner shells, and connection regions of liners. Here, the combination of axial membrane action and overlaps influences the crack network and thus the cutting strategy during deconstruction. In gutting works in existing buildings, lap splices often concentrate at openings, beam bearings, or slab joints &#8211; areas where <strong>concrete pulverizer<\/strong> enables precise exposure. In special operations such as dismantling complex reinforced-concrete aggregates or foundation blocks, it is helpful to locate splice zones early to coordinate splitting and cutting sequences. In natural stone extraction, the rebar lap splice only matters where cast-in components, foundations, or infrastructure reinforcements are involved; the same principles apply there.<\/p>\n<ul>\n<li><strong>Constrained environments<\/strong>: limited access, ventilation constraints, and vibration limits call for low-noise, low-vibration stages with careful pressure ramp-up on splitters.<\/li>\n<li><strong>Segmented approach<\/strong>: divide massive components into fields that avoid aligning separation joints with lap-intensive regions.<\/li>\n<\/ul>\n<h2>Typical Failure Patterns and Risks in Existing Structures<\/h2>\n<p>Corrosion in splice regions reduces effective bond and load reserve. Insufficient lap lengths or unfavorable locations (e.g., in heavily cracked zones) are found particularly in older structures or modified areas. During deconstruction, this can lead to unexpected crack propagation, premature spalling, or the abrupt failure of local cross-sections. Therefore, splice regions must be checked before large-scale fragmentation and, if necessary, mitigated by rerouting loads, installing shoring, and adjusting the separation sequence. A prudent approach and the choice of suitable hydraulic tools &#8211; from the controlled bite of the <strong>concrete pulverizer<\/strong> to the linear scoring by the <strong>hydraulic splitter<\/strong> &#8211; increase the predictability of fracture patterns.<\/p>\n<ul>\n<li><strong>Warning signs<\/strong>: rust staining, delamination sounds on hammer tapping, wide longitudinal cracks along bar runs, and excessive deflection under minor load changes.<\/li>\n<li><strong>Immediate measures<\/strong>: suspend cutting, enhance shoring, and re-sequence operations to restore staggered force transfer.<\/li>\n<\/ul>\n<h2>Planning, Documentation, and Collaboration<\/h2>\n<p>Proper preparation begins with gathering the relevant construction documents and a member-specific assessment of potential splice locations. On site, exposures should be documented, lap lengths estimated, and compared with the planned separation strategy. Collaboration with structural design is advisable to assess load redistribution during the work steps. Legally binding assessments remain the responsibility of the project\u2019s qualified personnel; as a general rule on site, treat splice regions as safety-relevant zones. For execution, a coordinated interplay of hydraulic power pack, cutting and crushing tools, and &#8211; where suitable &#8211; <strong>hydraulic splitter<\/strong> takes priority to process lap splices in a controlled manner and systematically reduce residual capacity.<\/p>\n<ul>\n<li><strong>Documentation set<\/strong>: drawings and notes of verified bar layouts, measured lap lengths, photos, and sequencing plans with hold points.<\/li>\n<li><strong>Quality and safety<\/strong>: define inspection criteria after each stage (fragmentation, exposure, cutting) and acceptance thresholds before proceeding.<\/li>\n<li><strong>Interfaces<\/strong>: align noise, dust, and vibration constraints with the chosen method to avoid unplanned changes near splice zones.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The rebar lap splice is a central detail of reinforced concrete construction and plays a decisive role in both new construction and deconstruction. In existing structures, it influences the load-carrying behavior and thus the sequence and method of controlled demolition. Anyone who selectively cuts, mills, crushes, or splits concrete members <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20230","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rebar Lap Splice in Reinforced Concrete Demolition<\/title>\n<meta name=\"description\" content=\"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety &amp; cutting strategy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rebar Lap Splice in Reinforced Concrete Demolition\" \/>\n<meta property=\"og:description\" content=\"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety &amp; cutting strategy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-22T15:00:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rebar-lap-splice\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rebar-lap-splice\",\"name\":\"Rebar Lap Splice in Reinforced Concrete Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-02-02T10:47:46+00:00\",\"dateModified\":\"2026-06-22T15:00:04+00:00\",\"description\":\"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety & cutting strategy.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rebar-lap-splice#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rebar-lap-splice\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/rebar-lap-splice#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Rebar lap splice\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rebar Lap Splice in Reinforced Concrete Demolition","description":"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety & cutting strategy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice","og_locale":"en_US","og_type":"article","og_title":"Rebar Lap Splice in Reinforced Concrete Demolition","og_description":"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety & cutting strategy.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-22T15:00:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice","url":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice","name":"Rebar Lap Splice in Reinforced Concrete Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-02-02T10:47:46+00:00","dateModified":"2026-06-22T15:00:04+00:00","description":"Practical guide to reinforced concrete overlaps \u2713 rebar lap splice design, demolition safety & cutting strategy.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/rebar-lap-splice#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Rebar lap splice"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20230","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20230"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20230\/revisions"}],"predecessor-version":[{"id":28557,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20230\/revisions\/28557"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}